Planning application
Unit 8 Barracuda Way Burscough Lancashire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of one building (Use Class B2/B8/E(g)(i), (ii) & (iii)) with associated access, infrastructure and boundary treatments.
As published by the council, reference 2024/0774/FUL
Application record
- Reference
- 2024/0774/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Granted As published: Planning Permission Granted
- Received
- 12 Sep 2024
- Validated
- 19 Sep 2024
- Decided
- 18 Dec 2024
- Ward
- Burscough Town Ward
- Parish
- Burscough Town Council
- Decision by
- Delegated unless Member request to Cttee
Timeline
Dates from the published record
-
12 Sep 2024
Received by Sefton
-
19 Sep 2024
Validated
Checked as complete and ready for consideration.
-
18 Dec 2024
Decision issued: Planning Permission Granted
-
30 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Lichfields Agent, registered in Newbury
Active · incorporated 2006 · Newbury
1,984 applications on PlanIndex · across 164 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordCrompton Developments Ltd Applicant, a developer registered in Burscough
Active · incorporated 2009 · Burscough
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
- Decision-full planning - approved
- Proposed - sheet 1 of 2
- Proposed - sheet 2 of 2
- Proposed
- Proposed
- Proposed cgi
- Site wide
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Sefton granted permission on 18 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Unit 8 Barracuda Way Burscough Lancashire
Erection of one building (Use Class B2/B8/E(g)(i), (ii) & (iii)) with associated access, infrastructure and boundary treatments.
Granted Full applications 7 docs -
Land To The East Of Tollgate Road Burscough Lancashire
Reserved Matters - The construction of 17 employment buildings (falling within use classes E, B2 & B8) comprising a total of 25,475.73sqm (GEA) and associated works pursuant to the outline element of hybrid planning permission ref. 2018/0525/HYB including approval of details reserved by condition 3 (finished floor levels), 5 (travel Plan), 6 (landscaping scheme), 7 (arboricultural method statement),8 (landscape management plan), 10 (surface water drainage), 11 (SuDS maintenance), 12 (foul water drainage), 13 (nesting boxes) and 14 (ecological management plan).
Granted Reserved matters 35 docs -
Land To The East Of Tollgate Road Burscough Lancashire
Non Material Amendment to planning permission - 2021/0113/ARM - Alterations to design and scale of unit 8
Refused Amendments 4 docs -
Land To The East Of Tollgate Road Burscough Lancashire
Non Material Amendment to planning permission - 2021/0113/ARM - Alterations to design and scale of unit 8
Refused Amendments 4 docs -
Land To The East Of Tollgate Road Burscough Lancashire
Non Material Amendment to planning permission - 2021/0113/ARM - Alterations to design of Units 8, 11 and 12
Granted Amendments 5 docs -
1 Hacketts Amusements Depot Tollgate Road Burscough Ormskirk Lancashire L40 8LD
Erection of a building including an internal single floor mezzanine for use as a road traffic accident claims centre comprising a mix of offices and car storage with ancillary maintenance and cleaning facilities; or alternatively uses falling within use classes E, B2 and B8 along with an adjoining external covered wash bay structure, together with other associated works.
Granted Full applications 13 docs
Other full applications
In Sefton
-
2026/0326/FUL Granted
9 Beechwood Drive Ormskirk Lancashire L39 3NU
Two storey side and rear extension
-
2026/0620/FUL Granted
13 Wilson Close Tarleton Preston Lancashire PR4 6DE
Proposed single storey front/side extension to existing dwelling.
-
2026/0672/FUL Granted
145 Burscough Street Ormskirk Lancashire L39 2EP
Single storey extension to side and rear.
-
2026/0636/FUL Granted
Halsall St Cuthberts C Of E Primary School New Street Halsall Ormskirk Lancashire L39 8RR
Installation of roof mounted solar panels
-
2026/0815/FUL Awaiting decision
13 Turnpike Road Aughton Ormskirk Lancashire L39 3LD
Proposed front / side extension following the removal of existing Garage