Skip to content
PlanIndex Get alerts
Menu

Planning application

8 The Serpentine Aughton Ormskirk Lancashire L39 6RW

Granted Sefton 2019/1083/FUL Full Planning Application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey rear extension, alterations to the front facing dormer, and construction of a side facing dormer.

As published by the council, reference 2019/1083/FUL

Application record

Reference
2019/1083/FUL
Type
Full Planning Application
Status
Decided
Decision
Planning Permission Granted
Received
25 Oct 2019
Validated
30 Oct 2019
Decided
23 Dec 2019
Ward
Aughton And Downholland
Parish
Aughton
Decision by
Delegated
Postcode
L39 6RW

Timeline

Dates from the published record

  1. 25 Oct 2019

    Received by Sefton

  2. 30 Oct 2019

    Validated

    Checked as complete and ready for consideration.

  3. 23 Dec 2019

    Decision issued: Planning Permission Granted

  4. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 8 The Serpentine Aughton Ormskirk Lancashire L39 6RW

    2019/1083/FUL Submitted 25 Oct 2019 0m away

    Proposed single storey rear extension, alterations to the front facing dormer, and construction of a side facing dormer.

    Granted Full applications Extension Loft or dormer 13 docs
    Small domestic
  • 17 The Serpentine Aughton Ormskirk Lancashire L39 6RN

    2024/0672/FUL Submitted 1 Aug 2024 76m away

    Single storey side and rear wrap-around extension, first floor hipped to gable roof conversion, internal reconfiguration and recomposition of elevations

    Refused Full applications Extension 10 docs
    Small domestic
  • 17 The Serpentine Aughton Ormskirk Lancashire L39 6RN

    2024/0672/FUL Submitted 1 Aug 2024 76m away

    Single storey side and rear wrap-around extension, first floor hipped to gable roof conversion, internal reconfiguration and recomposition of elevations

    Refused Full applications Extension 10 docs
    Small domestic
  • 294 Prescot Road Aughton Ormskirk Lancashire L39 6RR

    2026/0601/FUL Submitted 15 Jul 2026 78m away

    86% historically approved · decision due ~25 Sep

    To increase the height of the existing fence bordering the side of the property to 2m in height, next to a highway. To add a fence to the front of the property between the gateposts to approx 1.15m...

    Awaiting decision Full applications 7 docs
    Small domestic
  • 294 Prescot Road Aughton Ormskirk Lancashire L39 6RR

    2026/0601/FUL Submitted 15 Jul 2026 81m away

    86% historically approved · decision due ~25 Sep

    To increase the height of the existing fence bordering the side of the property to 2m in height, next to a highway. To add a fence to the front of the property between the gateposts to approx 1.15m height.

    Awaiting decision Full applications 8 docs
    Small domestic
  • 308 Prescot Road Aughton Ormskirk Lancashire L39 6RR

    T/2024/0085/TPO Submitted 25 Jun 2024 113m away

    Ash (T1) - Final stages of ash dieback - dismantle fell. Horse Chestnut (T2) - Crown raise 5.2m 20% crown thin via reduction cuts. Clear wire.

    Granted Trees 2 docs

In Sefton

  • 2026/0516/FUL Granted

    Holly Farm Bungalow Plex Lane Halsall Ormskirk Lancashire L39 7JY

    Single storey extension to rear together with loft conversion.

    19 Jun 2026 Full applications
  • 2026/0729/FUL Awaiting decision

    Land To The East Granville Park Aughton

    Demolition of an existing building and erection of a new building for uses falling within Class E.

    2 Sep 2026 Full applications
  • 2026/0728/FUL Awaiting decision

    Lower Wrennalls House Coopers Lane Hilldale Heskin Chorley Lancashire PR7 5PU

    Proposed erection of equestrian stable block.

    1 Sep 2026 Full applications
  • 2026/0595/FUL Refused

    Woodlands Liverpool Road Tarleton Preston Lancashire PR4 6HP

    Retrospective replacement of existing fence.

    13 Jul 2026 Full applications
  • 2026/0724/FUL Awaiting decision

    Stone Hall Cottage Crow Lane Dalton Wigan Lancashire WN8 7RY

    Part retrospective alterations and extensions incorporating partial demolition and reconstruction of the existing dwelling.

    31 Aug 2026 Full applications