Planning application
Torfichen Wind Farm Torfichen Hill Midlothian
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of 18 three-bladed horizontal axis turbines, up to 180 m tip height; associated low to medium voltage transformers and related switchgear at each turbine; turbine foundations; hardstand areas for erection cranes at each turbine location; a network of access tracks including watercourse crossings, turning heads and site entrance from the public road network; borrow pits
As published by the council, reference 25/00411/NECON
Application record
- Reference
- 25/00411/NECON
- Type
- Neighbouring Local Authorities
- Status
- Registered
- Received
- 1 Apr 2025
- Validated
- 1 Apr 2025
- Ward
- Outwith SBC Adminstrative Boundary
- Parish
- Outwith SBC Adminstrative Boundary
Site history
Applications at this address on the Scottish Borders register
This site has had 2 applications since 2023.
-
23/00114/NECON Decided
Torfichen Wind Farm Torfichen Hill Midlothian
The Proposed Development would comprise c.19 turbines, each c.180 m from ground to blade tip when vertical. Its total generating capacity is anticipated to be in the region of 114 MW
Timeline
Dates from the published record
-
1 Apr 2025
Received by Scottish Borders
-
5 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Scottish Borders took a median of 61 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Scottish Borders for determination, against a statutory target of eight weeks. Over the last year Scottish Borders's median decision took 61 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Scottish Borders's portal will say. Our guide explains the common types.