Skip to content
PlanIndex Get alerts
Menu

Planning application

Salford Civic Centre (Salford Radio Porta Cabins), Chorley Road, Swinton, M27 5AW

Granted Salford 23/81138/DEMCON Prior notification: Demolition

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior notification of proposed demolition of 2 no. storey porta cabins used for Salford Radio station and office space for SCC employees

As published by the council, reference 23/81138/DEMCON

Application record

Reference
23/81138/DEMCON
Type
Prior notification: Demolition
Status
Decision Made
Decision
Approve
Received
27 Jan 2023
Validated
27 Jan 2023
Decided
3 Mar 2023
Ward
Swinton and Wardley Ward
Decision by
Delegated Decision
Postcode
M27 5AW

Timeline

Dates from the published record

  1. 27 Jan 2023

    Received by Salford

  2. 3 Mar 2023

    Decision issued: Approve

  3. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

4 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

In Salford

  • NOT/2026/0922 Granted

    Mary Seacole Building, Statham Street, University of Salford, Salford, M6 6PU

    Application to determine whether prior approval is required for a proposed pitched roof-mounted 310.20kWp solar photovoltaic installation consisting of 660 × 470W PV modules.

    30 Jun 2026 Prior approval
  • NOT/2026/1020 Granted

    54 Standfield Drive, Worsley, Manchester, M28 1WB

    Application to determine whether prior approval is required for the erection of a single‑storey rear extension projecting 4 metres from the existing rear elevation, with a maximum height of 3.6 metres, an eaves height of 2.3 metres, with a mono‑pitched roof.

    20 Jul 2026 Prior approval
  • NOT/2026/0851 Refused

    Faulkner House, Elm Street, SWINTON, MANCHESTER, M27 6AJ

    Application to determine if prior approval is required for a proposed change of use of the first floor from offices (use class E) to 6no. self-contained apartments (use class C3)

    2 Jul 2026 Prior approval
  • NOT/2026/1042 Awaiting decision

    Barton Hall, Barton Hall Industrial Estate, Texas Group Plc, Hardy Street, Eccles, M30 7NB

    Application for prior notification of proposed demolition of a two-storey building

    13 Aug 2026 Prior approval
  • NOT/2026/0895 Decided

    22 Moor Lane, SALFORD, M7 3WX

    Application to determine if prior approval is required for a single storey rear extension 6m length, 3m maximum height, and 3m height to the eaves.

    25 Jun 2026 Prior approval