Planning application
Barton Hall, Barton Hall Industrial Estate, Texas Group Plc, Hardy Street, Eccles, M30 7NB
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application for prior notification of proposed demolition of a two-storey building
As published by the council, reference NOT/2026/1042
Application record
- Reference
- NOT/2026/1042
- Type
- Prior notification: Demolition
- Status
- Under Consultation
- Received
- 13 Aug 2026
- Validated
- 13 Aug 2026
- Ward
- Barton and Winton Ward
- Postcode
- M30 7NB
Timeline
Dates from the published record
-
13 Aug 2026
Received by Salford
-
3 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Salford took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Salford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
Unit G8, Barton Hall Industrial Estate, Hardy Street, Eccles, Manchester, M30 7NB
Erection of a wash bay canopy, with associated wash equipment, drainage infrastructure and ancillary works
Granted Full applications 11 docs -
9 Henty Close, Eccles, Manchester, M30 7ER
Erection of a single storey side and rear wrap round extension
Granted Householder Extension 8 docsSmall domestic -
Footpath outside 504 Liverpool Road, Peel Green, Eccles, Manchester M30 7HZ
Application for digital advertisement panels on both sides of BT Street Hub Unit
Refused Advertising 16 docs -
Footpath outside 504 Liverpool Road, Peel Green, Eccles, Manchester M30 7HZ
Installation of 1No. BT Street Hub Unit
Refused Full applications 15 docs -
4 Atherton Way, ECCLES, MANCHESTER, M30 8QA
Application to determine if prior approval is required for a proposed single storey rear extension - 3.50m length, 3.60m maximum height, and 2.50m height to eaves.
Granted Prior approval Extension 4 docsSmall domestic -
443 LIVERPOOL ROAD, ECCLES, MANCHESTER, M30 7HY
Conversion of residential element at ground floor level to Class E (retail). Retention and reconfiguration of living accommodation at first floor level to provide a self contained flat accessed via a new external staircase at the rear of the property.
Granted Full applications 9 docs
Other prior approval applications
In Salford
-
NOT/2026/0922 Granted
Mary Seacole Building, Statham Street, University of Salford, Salford, M6 6PU
Application to determine whether prior approval is required for a proposed pitched roof-mounted 310.20kWp solar photovoltaic installation consisting of 660 × 470W PV modules.
-
NOT/2026/1020 Granted
54 Standfield Drive, Worsley, Manchester, M28 1WB
Application to determine whether prior approval is required for the erection of a single‑storey rear extension projecting 4 metres from the existing rear elevation, with a maximum height of 3.6 metres, an eaves height of 2.3 metres, with a mono‑pitched roof.
-
NOT/2026/0851 Refused
Faulkner House, Elm Street, SWINTON, MANCHESTER, M27 6AJ
Application to determine if prior approval is required for a proposed change of use of the first floor from offices (use class E) to 6no. self-contained apartments (use class C3)
-
NOT/2026/0895 Decided
22 Moor Lane, SALFORD, M7 3WX
Application to determine if prior approval is required for a single storey rear extension 6m length, 3m maximum height, and 3m height to the eaves.
-
NOT/2026/0824 Granted
7 Wolfreton Crescent, SWINTON, MANCHESTER, M27 8LE
Application to determine if prior approval is required for a proposed single-storey rear extension, including creation of 1no. additional bedroom, 8m length, 4m maximum height, and 2.5m height to the eaves