Planning application
Rosedene Main Street Thistleton Rutland LE15 7RE
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Refurbishment and remedial works to Farmhouse
As published by the council, reference 2026/1106/LBA
Application record
- Reference
- 2026/1106/LBA
- Status
- Registered
- Received
- 4 Sep 2026
- Validated
- 10 Sep 2026
- Ward
- Greetham Ward
- Parish
- Thistleton Parish Meeting
- Decision by
- Delegated Decision
- Postcode
- LE15 7RE
Site history
Applications at this address on the Rutland register
This site has had 2 applications since 2024: 1 approved, 0 refused.
-
2024/0816/FUL Granted
Rosedene Main Street Thistleton Rutland LE15 7RE
Extension and external alterations to existing dwelling (including windows and doors), restoration of outbuilding and provision of ancillary residential floorspace, erection of car port, demolition of outbuilding and associated landscaping
Timeline
Dates from the published record
-
4 Sep 2026
Received by Rutland
-
10 Sep 2026
Validated
Checked as complete and ready for consideration.
-
10 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Rutland took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
- APPLICATION FORM - WITHOUT PERSONAL DATA
- LOCATION PLAN
- DESIGN AND ACCESS STATEMENT & HERITAGE IMPACT STATEMENT
- FLOOR PLANS & ELEVATIONS
- FLOOR PLANS & ELEVATIONS
- BLOCK PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Rutland for determination, against a statutory target of eight weeks. Over the last year Rutland's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Rutland's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Grange Farm Main Street Thistleton Rutland LE15 7RE
91% historically approved · decision due ~3 Nov
Replace existing stairlift with new one.
Awaiting decision 9 docs -
Bramley Cottage Main Street Thistleton Rutland LE15 7RF
Single garage to the rear left hand side of the property.
Granted Full applications 10 docs -
1 Church Cottage Main Street Thistleton Rutland LE15 7RF
Discharge of Condition 5 (Landscaping) on planning permission ref: 2024/1485/FUL (Demolition of existing annexe and replace with annexe, workshop and store with store/sunroom above.).
Granted Conditions Demolition 6 docs -
The Grange Main Street Thistleton Rutland LE15 7RE
Variation of condition in relation to 2021/1118/FUL (The first floor of the old barn will be converted into an annex to the main house which will include the formation of a juliet balcony to the South elevation. External alterations to the ground floor storerooms and reposition the existing external staircase to the West Elevation). Amendment - Installation of new window to north elevation.
Granted Full applications Windows or glazing 10 docs -
Dapple Cottage Main Street Thistleton Rutland LE15 7RE
Section 73 application in order to vary conditions 2 (approved plans) and 3 (materials) of application 2021/0394/FUL - Partial demolition of existing dwelling, rear and side extensions.
Granted Full applications Extension Demolition 7 docsDomestic -
Dapple Cottage Main Street Thistleton Rutland LE15 7RE
Partial demolition of existing dwelling, rear and side extensions.
Granted Full applications Extension Demolition 17 docsDomestic