Planning application
The Barn 4A Glebe Road North Luffenham Rutland LE15 8JU
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Replacement of existing conservatory with a single-storey extension.
As published by the council, reference 2026/0961/FUL
Application record
- Reference
- 2026/0961/FUL
- Category
- Full applications
- Status
- Registered
- Received
- 3 Aug 2026
- Validated
- 3 Aug 2026
- Ward
- Normanton Ward
- Parish
- North Luffenham Parish Council
- Decision by
- Delegated Decision
- Postcode
- LE15 8JU
Timeline
Dates from the published record
-
3 Aug 2026
Received by Rutland
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Rutland took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Stamford
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Rutland for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
The Barn 4A Glebe Road North Luffenham Rutland LE15 8JU
Crown raise 1 No. Walnut tree (T1) to no more than 3m above ground level, removing only secondary branches. Remove 1 No. Ash Tree (T2)
Granted Trees 4 docs -
6A Glebe Road North Luffenham Rutland LE15 8JU
Alterations to the front and rear facade include changes to existing glazing, raising the roof line, addition of a balcony, single-storey extension, and high-level window on the East elevation. Landscaping work to front and rear; to include the creation of terrace with steps.
Granted Full applications Extension Windows or glazing 16 docsSmall domestic -
Chater Cottage Glebe Road North Luffenham Rutland LE15 8JU
Remove existing wooden combi-summerhouse with shed (8 x 12feet) and replace with new shed (8 x 12feet) with pent roof.
Granted Full applications 8 docsSmall domestic -
Land Adj Pasture House 10 Glebe Road North Luffenham Rutland
Non Material amendment application for 2020/1213/FUL - Small increase in the width of the Garden Rooms of each plot. Internal space reconfiguration to the floor plans of each plot. Alterations to fenestration. Installation of Air Source Heat Pumps. Confirmation of materials as submitted and approved under application 2021/0233/DIS. Clarify anomalies with current approved plans and elevations.
Granted Amendments Windows or glazing 8 docs -
Land Adj Pasture House 10 Glebe Road North Luffenham Rutland
Discharge of conditions 2 (hard and soft landscaping), 4 (tree protection) and 9 (external facing and roof materials) of planning application 2020/1213/FUL - Variation of condition 2 (approved plans) of planning application 2017/0008/FUL - Erection of 3 new dwellings.
Granted Conditions New dwelling Trees 17 docsSeveral homes -
Lambley Cottage Lyndon Road North Luffenham Rutland LE15 8JZ
Discharge of Condition 3 ( Large scale plans - Rooflights and Dormers), 4 (materials) and 5 (Bat and Bird Ecology survey) for application 2020/0760/FUL.
Split decision Conditions Loft or dormer 10 docs
Other full applications applications
In Rutland
-
2026/1088/FUL Awaiting decision
1 Tippings Lane Barrowden Rutland LE15 8EW
Installation of new entrance gates & fencing to front of property.
-
2026/1075/FUL Awaiting decision
Silver Birches 3B Top Road Ridlington Rutland LE15 9AX
Demolition of conservatory and construction of single storey family room
-
2025/1635/FUL Withdrawn
Land To The South Of Stonecrop House 5A Top Street Wing Rutland
Installation of 14 no. photovoltaic panels along the north edge of a vegetable growing area.
-
2026/1062/FUL Awaiting decision
East Wing Ashwell Hall Ashwell Hall Lane Ashwell Rutland LE15 7SR
Construction of a detached carport.
-
2026/1059/FUL Awaiting decision
66 Stockerston Road Uppingham Rutland LE15 9UD
Single-storey extension to the existing bungalow to provide a garage.