Planning application
26/00366/PDCPP
110 Fleet Road Farnborough Hampshire GU14 9RG
Proposal
LAWFUL DEVELOPMENT CERTIFICATE FOR A PROPOSED DEVELOPMENT:Conversion of the attached garage into habitable rooms
As published by the council, reference 26/00366/PDCPP
Timeline
Dates from the published record
-
3 Jul 2026
Received by Rushmoor
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Rushmoor for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21/00493/TPO Split decision
108 Fleet Road Farnborough Hampshire GU14 9RG
Remove one Oak (T4 of TPO 358A)
-
26/00375/TPO Awaiting decision
106 Fleet Road Farnborough Hampshire GU14 9RG
One Beech T5 on plan (T3 of TPO 358V) crown reduce by no more than 3 metres in height and laterals by no more than 2 metres and crown lift by no more than 5 metres from ground level. Remove dead, damaged or crossing branches. Four Oaks G1 on plan (group G16 of TPO 358V) crown reduce by no more than 2.5 metres, crown lift branches over footpath to provide no more than 3 metres clearance and crown lift over highway by no more than 5 metres from ground level and no more than 2 metres from dwelling. Remove dead damaged and crossing branches
-
25/00587/TPOPP Split decision
114 Fleet Road Farnborough Hampshire GU14 9RG
Front garden Oak tree (part of group G19 of TPO 358V) remove four branches overhanging the road. Back garden Oak tree (T6 of TPO 358V) remove branches as per submitted photographs
-
26/00007/TPOPP Granted
114 Fleet Road Farnborough Hampshire GU14 9RG
Remove one decayed and declining Oak tree as per submitted report (T6 of TPO 358V)
-
25/00435/TPOPP Withdrawn
2 The Birches Farnborough Hampshire GU14 9RP
One English Oak (part of group G21 of TPO 358V) cut back to give no more than 2 metres clearance from house and roof pruning back to suitable live secondary growth, thin crown by no more than 15% and remove dead wood down to 25mm or 1 metre in length. Lift lower canopy all round to no more than 5.5 metres from ground level, in line with the house gutter
-
26/00132/TPOPP Granted
2 The Birches Farnborough Hampshire GU14 9RP
One Oak T1 on plan, crown reduce by no more than 3 metres all round. One Oak T2 on plan crown reduce by no more than 3 metres to balance crown. Both trees are part of group G21 of TPO 358V. One Norway Maple T3 (not a TPO tree) crown reduce by 2 metres to balance crown
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure