Planning application
26/00330/PDCPP
3 Churchill Avenue Aldershot Hampshire GU12 4JR
Proposal
Conversion of a garage to a habitable room and erection of a front porch
As published by the council, reference 26/00330/PDCPP
Timeline
Dates from the published record
-
15 Jun 2026
Received by Rushmoor
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Rushmoor for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
26/00110/PDC Decided
22 Churchill Avenue Aldershot Hampshire GU12 4JR
LAWFUL DEVELOPMENT CERTIFICATE FOR PROPOSED DEVELOPMENT OR USE: Roof alterations in connection with a loft conversion including alterations to flue/soil vent pipe and installation of Solar PV Panels.
-
26/00186/ADVPP Awaiting decision
Manor Coach House Church Hill Aldershot Hampshire GU12 4RQ
Display of 3 x non-illuminated timber plaque signs adjacent to entrance door and on roadside boundary wall
-
26/00174/LBCPP Granted
Manor Coach House Church Hill Aldershot Hampshire GU12 4RQ
Exterior re-staining of modern timber panels
-
26/00173/LBC Awaiting decision
Manor Coach House Church Hill Aldershot Hampshire GU12 4RQ
Display of 3 x non-illuminated timber plaque signs adjacent to entrance door and on roadside boundary wall
-
20/00289/FULPP Granted
127 Church Lane East Aldershot Hampshire GU11 3ST
Retention and completion of first floor and attic extension and associated alterations
-
25/00499/FUL Granted
67 Elston Road Aldershot Hampshire GU12 4HZ
Retention of raised decking area to rear with a solid wood panel screening measuring 1.7m from decking area platform on the elevation between the adjoinig neighbour
Other outline applications
In Rushmoor
-
26/00421/PDCPP Awaiting decision
1 Willow Crescent Farnborough Hampshire GU14 8EY
Certificate of Lawfulness for Proposed Development: Erection of a front porch extension and erection of a single storey side extension with replacement roof over existing side structure
-
26/00419/PDCPP Awaiting decision
41 Highfield Gardens Aldershot Hampshire GU11 3DB
Certificate of Lawfulness for Proposed Development: Formation of a hip to gable roof extension with front and rear facing roof windows to facilitate a loft conversion
-
26/00398/HCC Awaiting decision
Stanhope Primary School Masters Road Wellesley Aldershot Hampshire GU11 4GJ
HAMPSHIRE COUNTY COUNCIL CONSULTATION : Construction of a new 2 Form Entry, 420 pupil place Primary School with SEN Resource Provision for 8 pupils, including associated parking and external works [Variation of conditions 6 (Landscape) 7 (Ecology) 8 (BNG) 20 (Plans) of PP: 23/00729/HCC] at Stanhope Primary School, Masters Road, Wellesley, Aldershot, Hampshire GU11 4GJ
-
26/00360/PDCPP Awaiting decision
64 Park Road Aldershot Hampshire GU11 3PX
LAWFUL DEVELOPMENT CERTIFICATE FOR PROPOSED DEVELOPMENT: Removal of rear chimney stack
-
26/00347/PDCPP Awaiting decision
66 Park Road Aldershot Hampshire GU11 3PX
LAWFUL DEVELOPMENT CERTIFICATE: Loft conversion with L- shaped dormer, rooflight windows on the front roof slope, removal of the rear chimney to facilitate two bedrooms and a bathroom within the loft space