Skip to content
PlanIndex Get alerts
Menu

Planning application

Blackwater Shopping Park Farnborough Gate Farnborough Hampshire

Awaiting decision Rushmoor 26/00320/ADVPP

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Display of non-illuminated signage comprising 5 no. free-standing dual-post signs and 3 no. projecting signs fixed to lighting columns adjacent to EV charging bays

As published by the council, reference 26/00320/ADVPP

Application record

Reference
26/00320/ADVPP
Status
Awaiting decision
Received
10 Jun 2026
Validated
10 Jun 2026
Ward
Empress
Decision by
Delegated

Site history

Applications at this address on the Rushmoor register

This site has had 4 applications since 2020: 2 approved, 0 refused.

  • 26/00027/FULPP Granted

    Blackwater Shopping Park Farnborough Gate Farnborough Hampshire

    Relaxation of Condition No.13 (retention of parking) of planning permission 93/00016/FUL dated 10 January 1994 and Condition No.7 (external equipment installation) of planning permission 20/00149/FULPP dated 1 April 2022 to facilitate installation of electric vehicle charging hub with associated infrastructure including sub-station, charge power units, feeder pillar, comms cabinet, 6 X dual-output charging outlets, lighting and CCTV, including removal of 3 existing EV charging outlets

    Decided 11 Mar 2026 Full applications
  • 26/00028/ADVPP Withdrawn

    Blackwater Shopping Park Farnborough Gate Farnborough Hampshire

    Application for Advertisement Consent : Display of free-standing pole sign with LED internally-illuminated logo and wording; and non-illuminated signs comprising (a) 5 X EV charging dual-post signs; and (b) a dual-post right-turn direction sign on Shopping Park entrance roundabout

    Decided 3 Mar 2026 Advertising
  • 20/00665/ADVPP Granted

    Blackwater Shopping Park Farnborough Gate Farnborough Hampshire

    ADVERTISEMENT CONSENT: Display of various non-illuminated directional and warning signs within the customer car par area; on the fence beside the pedestrian access ramp from Farnborough Road; and the entrance to the service yard

    Decided 9 Nov 2020 Advertising

Timeline

Dates from the published record

  1. 10 Jun 2026

    Received by Rushmoor

  2. 26 Jul 2026

    Added to PlanIndex

  3. 7 Aug 2026

    Status changed to Awaiting decision

    Previously Registered.

  4. Decision

    Awaiting decision

    Decision expected by 5 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Rushmoor took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Planware Limited Agent, registered in Bury St. Edmunds

Active · incorporated 2001 · Bury St. Edmunds

629 applications on PlanIndex · across 139 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Osprey Charging Network Ltd Applicant, registered in Canterbury

Active · incorporated 2013 · Canterbury

13 applications on PlanIndex · across 9 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • Officer report Report · 11 Aug 2026
  • Acknowledgement letter Correspondence · 18 Jun 2026
  • Proposed lamp-column banner signs Plans · 10 Jun 2026
  • Proposed dual post signs Plans · 10 Jun 2026
  • Layout plan showing position of all proposed signs Plans · 10 Jun 2026
  • Location plan showing position of 5 no.dual post signs Plans · 10 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Rushmoor for determination, against a statutory target of eight weeks. Over the last year Rushmoor's median decision took 42 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Rushmoor's portal will say. Our guide explains the common types.