Planning application
26/00192/FULPP
46 Station Road Aldershot Hampshire GU11 1HT
Proposal
The change of use of the first-floor commercial space (Use Class E) to Use Class F2 (community hall) and the erection of a first-floor rear extension at No. 44 Station Road, which will connect internally with No. 46 Station Road and 85 Victoria Road to create a single, unified community facility
As published by the council, reference 26/00192/FULPP
Timeline
Dates from the published record
-
12 Apr 2026
Received by Rushmoor
-
13 Apr 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Rushmoor for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20/00193/FULPP Granted
25 Station Road Aldershot Hampshire GU11 1HT
Erection of a single storey rear extension
-
25/00626/REVPP Awaiting decision
25 Station Road Aldershot Hampshire GU11 1HT
Variation of Condition 2 attached to planning application Ref; 99/00192/COU dated 21 May 1999 (Change of use from shop to family entertainment centre) to allow 24 hour opening 7 days a week
-
26/00074/PDCPP Withdrawn
Copthall House 77 - 79 Victoria Road Aldershot Hampshire GU11 1SH
CERTIFICATE OF LAWFULNESS FOR A PROPOSED USE OR DEVELOPMENT: Change of use of part ground floor from Gym (Use Class E(d)) to Grocery Retail shop (Use Class E(a))
-
26/00137/FULPP Granted
Copthall House 77 - 79 Victoria Road Aldershot Hampshire GU11 1SH
Change of use of part of the ground floor from Gym (Use Class E(d)) to Grocery Retail Shop (Use Class E(a))
-
23/00105/NMAPP Granted
69 Victoria Road Aldershot Hampshire GU11 1SJ
Non-Material Amendment to planning permission 21/00235/FULPP to add velux window and canopy.
-
26/00295/NMAPP Awaiting decision
Hippodrome House Birchett Road Aldershot Hampshire GU11 1LZ
NON MATERIAL AMENDMENT: amendments to development scheme approved with planning permission 23/00019/FULPP dated 11 March 2024 comprising full enclosure of escape stair with installation of back cladding panels (grey in colour) and provision of roof covering, together with erection of bridge over existing plant structure at ground floor level
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure