26/00017/FULPP

153 Church Lane East Aldershot Hampshire GU11 3ST

Awaiting decision Rushmoor Full App via planning portal

Proposal

Retention and completion of outbuilding in rear garden, to contain a gym, shower, toilet and storage

As published by the council, reference 26/00017/FULPP

Timeline

Dates from the published record

  1. 14 Jan 2026

    Received by Rushmoor

  2. 29 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Rushmoor for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/00412/FULPP Refused

    153 Church Lane East Aldershot Hampshire GU11 3ST

    Erection of single storey front extension, first floor rear extension and outbuilding in rear garden

    26 Jul 2025 0m away Full applications
  • 24/00584/FULPP Withdrawn

    150 Church Lane East Aldershot Hampshire GU11 3SS

    Erection of a two storey side extension

    20 Sep 2024 61m away Full applications
  • 26/00041/FUL Granted

    8 Church Road Aldershot Hampshire GU11 3PS

    Retention of a roof light to the front elevation, a first floor side extension, two storey side and rear extension, single storey rear extension and a rear dormer and replacement Upvc windows

    2 Feb 2026 111m away Full applications
  • 26/00110/PDC Decided

    22 Churchill Avenue Aldershot Hampshire GU12 4JR

    LAWFUL DEVELOPMENT CERTIFICATE FOR PROPOSED DEVELOPMENT OR USE: Roof alterations in connection with a loft conversion including alterations to flue/soil vent pipe and installation of Solar PV Panels.

    4 Mar 2026 165m away Outline
  • 20/00289/FULPP Granted

    127 Church Lane East Aldershot Hampshire GU11 3ST

    Retention and completion of first floor and attic extension and associated alterations

    4 May 2020 187m away Full applications
  • 25/00499/FUL Granted

    67 Elston Road Aldershot Hampshire GU12 4HZ

    Retention of raised decking area to rear with a solid wood panel screening measuring 1.7m from decking area platform on the elevation between the adjoinig neighbour

    16 Sep 2025 229m away Full applications

In Rushmoor

  • 26/00429/FULPP Awaiting decision

    27A Woburn Avenue Farnborough Hampshire GU14 7EQ

    Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation

    29 Jul 2026 Full applications
  • 26/00424/FULPP Awaiting decision

    160 Alexandra Road Farnborough Hampshire GU14 6RY

    Erection of a two storey rear/side extension

    27 Jul 2026 Full applications
  • 26/00420/FULPP Awaiting decision

    50 Sidlaws Road Farnborough Hampshire GU14 9JN

    Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch

    25 Jul 2026 Full applications
  • 26/00417/FULPP Awaiting decision

    61 Queensmead Farnborough Hampshire GU14 7RL

    External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation

    24 Jul 2026 Full applications
  • 26/00407/FULPP Awaiting decision

    Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF

    Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure

    17 Jul 2026 Full applications