Planning application
25/00643/FULPP
3 Station Road Aldershot Hampshire GU11 1HN
Proposal
Temporary use of building as a cafe (Use Class Eb)
As published by the council, reference 25/00643/FULPP
Timeline
Dates from the published record
-
28 Nov 2025
Received by Rushmoor
-
11 Feb 2026
Decision issued: Permission Granted
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
23/00105/NMAPP Granted
69 Victoria Road Aldershot Hampshire GU11 1SJ
Non-Material Amendment to planning permission 21/00235/FULPP to add velux window and canopy.
-
26/00111/FULPP Awaiting decision
Storage Land East Station Road Aldershot Hampshire
Change of use from nil-use to mixed commercial, retail and storage use (sui generis), and associated retention of mobile structures and generator (Retrospective)
-
25/00438/FULPP Granted
Holy Trinity Church Victoria Road Aldershot Hampshire GU11 1SJ
Erection of powder coated, mild steel decorative formal entry arch to church gardens designed by Hot Metal Works
-
26/00295/NMAPP Awaiting decision
Hippodrome House Birchett Road Aldershot Hampshire GU11 1LZ
NON MATERIAL AMENDMENT: amendments to development scheme approved with planning permission 23/00019/FULPP dated 11 March 2024 comprising full enclosure of escape stair with installation of back cladding panels (grey in colour) and provision of roof covering, together with erection of bridge over existing plant structure at ground floor level
-
25/00434/LBCPP Granted
Holy Trinity Church Victoria Road Aldershot Hampshire GU11 1SJ
Listed Building Consent: Installation of a new metal archway at the main entrance to Holy Trinity Church on Victoria Road
-
26/00137/FULPP Granted
Copthall House 77 - 79 Victoria Road Aldershot Hampshire GU11 1SH
Change of use of part of the ground floor from Gym (Use Class E(d)) to Grocery Retail Shop (Use Class E(a))
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure