Skip to content
PlanIndex Get alerts
Menu

Planning application

3B Holly Close Farnborough Hampshire GU14 0ED

Granted Rushmoor 25/00618/FULPP Full App via planning portal

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Garage conversion including replace garage door with window, insertion of ground floor side window and erection of a single storey rear extension

As published by the council, reference 25/00618/FULPP

Application record

Reference
25/00618/FULPP
Type
Full App via planning portal
Status
Decided
Decision
Permission Granted
Received
15 Nov 2025
Validated
15 Nov 2025
Decided
23 Dec 2025
Ward
Cove And Southwood
Decision by
Delegated
Postcode
GU14 0ED

Timeline

Dates from the published record

  1. 15 Nov 2025

    Received by Rushmoor

  2. 23 Dec 2025

    Decision issued: Permission Granted

  3. 26 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

DOHarchitecture Agent, registered in Camberley

Active · incorporated 2015 · Camberley

81 applications on PlanIndex · across 9 councils · 88% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

  • Acknowledgement letter Correspondence · 25 Nov 2025
  • Applicationformredacted Application Form · 15 Nov 2025
  • Location and block plan Plans · 15 Nov 2025
  • Existing plans Plans · 15 Nov 2025
  • Existing elevations Plans · 15 Nov 2025
  • Proposed plans Plans · 15 Nov 2025
  • Proposed elevations Plans · 15 Nov 2025
  • Design-access and planning statement - 25.11.14 Report · 15 Nov 2025
  • Ecological and species survey-report - 25.11.14 Report · 15 Nov 2025
  • Hwd004 3b holly close aia Report · 15 Nov 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Rushmoor granted permission on 23 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 10 Stuart Close Farnborough Hampshire GU14 8PW

    21/00086/TPO Submitted 5 Feb 2021 70m away

    One Oak Tree - reduce back to previous pollard knuckles, by removing up to 4meters off all branch tips (T2 of TPO 437)

    Granted Trees 4 docs
  • 30 Holly Road Farnborough Hampshire GU14 0EA

    24/00514/TPOPP Submitted 27 Aug 2024 76m away

    Lift the canopy of Weeping Willow (T2 of TPO 302V) to give no more than 4 metres ground level clearance, reduce the crown no further than the previous pruning points, remove any deadwood and repeat as required

    Granted Trees 3 docs
  • 30 Holly Road Farnborough Hampshire GU14 0EA

    21/00450/TPOPP Submitted 30 May 2021 86m away

    Weeping Willow - crown lift by no more than 2 meters, to provide suitable clearance from ground level (T2 of TPO 302A)

    Granted Trees 9 docs
  • Esso Pipeline Rushmoor General Street Farnborough Hampshire

    21/00437/DOR Submitted 28 May 2021 100m away

    Requirement 7 - CTMP (Construction Traffic Management Plan)

    Granted Conditions 6 docs
  • Esso Pipeline Rushmoor General Street Farnborough Hampshire

    21/00442/DOR Submitted 28 May 2021 100m away

    Appliation for disharge of requirement 11 - Archaeology

    Granted Conditions 12 docs
  • Esso Pipeline Rushmoor Borough Area Farnborough Hampshire

    19/00432/PINS Submitted 25 Jun 2019 100m away

    Southampton to London Esso Fuel Pipeline from the A327 crossing the western section of Southwood Country Park, through land to the west of Cove Brook, Cove Road and Nash Close, crossing the South Western main railway line to the west of Farnborough. Running east alongside the railway line to Stake Lane through Queen Elizabeth Park to the north of Farnborough Station, crossing open land at Farnborough Hill School under the North Downs railway line, A331, and River Blackwater

    Granted Outline 147 docs

In Rushmoor

  • 26/00350/FUL Decided

    22 Southwood Road Farnborough Hampshire GU14 0JQ

    Attic conversion with the addition of front and rear rooflights

    29 Jun 2026 Full applications
  • 26/00409/FULPP Decided

    116 Chapel Lane Farnborough Hampshire GU14 9BL

    Continued use of the premises as a hand car wash and valeting facility (sui generis) and erection of acoustic mitigation measures comprising the relocation of noise-generating motors to an internal plant room, the erection of an acoustic screen and associated alterations to the jet washing equipment and forecourt cabling.

    17 Jul 2026 Full applications
  • 26/00474/FUL Awaiting decision

    The Connaught Centre 1 - 3 Alanbrooke Road Aldershot Hampshire GU11 2NX

    Installation of outdoor exercise equipment with a 1.00m high yellow powder coated bow top fence surround with gates, and eco smart grass matting

    21 Aug 2026 Full applications
  • 26/00443/FUL Awaiting decision

    6A Alexandra Road Farnborough Hampshire GU14 6DA

    Front extension

    4 Aug 2026 Full applications
  • 26/00433/FUL Awaiting decision

    3 Churchill Avenue Aldershot Hampshire GU12 4JR

    Conversion of a garage to a habitable room, erection of a hipped roof on the flat roof of the garage and front door to create a covered porch area

    30 Jul 2026 Full applications