Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Adjacent To 235 Ash Road Aldershot Hampshire

Granted Rushmoor 21/00414/FUL Full Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Addition of window to the western elevation to facilitate third party delivery/ pick up services.

As published by the council, reference 21/00414/FUL

Application record

Reference
21/00414/FUL
Type
Full Application
Status
Decided
Decision
Permission Granted
Received
5 May 2021
Validated
7 May 2021
Decided
1 Jul 2021
Ward
North Town
Decision by
Service Manager

Timeline

Dates from the published record

  1. 5 May 2021

    Received by Rushmoor

  2. 7 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 1 Jul 2021

    Decision issued: Permission Granted

  4. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy

75 applications on PlanIndex · across 42 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Clyde Court 233 Ash Road Aldershot Hampshire GU12 4WD

    20/00211/CONDPP Submitted 25 Mar 2020 23m away

    Submission of details pursuant to conditions 3 (External Materials) 4 (Noise attenuation measures) 6(Biodiversity Enhancements) 7 (Surfacing Materials) and 8 (Landscaping) of planning permission 19/00682/FULPP dated 18 December 2019

    Granted Conditions 9 docs
  • 1 North Close Aldershot Hampshire GU12 4HA

    20/00130/ADVPP Submitted 18 Feb 2020 48m away

    Installation of 3no. double digital freestanding signs, 1no. single digital freestanding sign and 1 no. 15" digital booth screen

    Granted Advertising 10 docs
  • 1 North Close Aldershot Hampshire GU12 4HA

    21/00048/REVPP Submitted 22 Jan 2021 49m away

    Variation of condition 15 attached to planning permission 17/00344/REVPP dated 22.06.2017 for the erection of restaurant with drive-thru and takeaway facility, to allow permitted hours of use from 06:00 to 00:00, 7 days a week

    Refused Amendments 22 docs
  • 1 North Close Aldershot Hampshire GU12 4HA

    26/00211/REVPP Submitted 24 Apr 2026 53m away

    96% historically approved · decision due ~24 Jun

    Variation of condition 1 (hours of operation) imposed on planning permission 25/00117/REVPP dated 11 June 2025, for a restaurant with drive-through and takeaway facility (Use Class E) and associated structures, fencing, parking, landscaping and vehicular access; to allow permitted hours of operation from 06:00 to 23:00 hours, 7 days a week.

    Decided 14 docs
  • 251 Ash Road Aldershot Hampshire GU12 4DD

    21/00567/ADVPP Submitted 6 Jul 2021 61m away

    Display of 2 internally illuminated fascia signs and 1 internally illuminated free standing sign

    Granted Advertising 6 docs
  • 1 North Close Aldershot Hampshire GU12 4HA

    25/00635/FULPP Submitted 25 Nov 2025 65m away

    Install 4no. EV chargers and ancillary equipment within the car park that will replace the existing 2no. chargers.

    Granted Full applications 20 docs

In Rushmoor

  • 26/00409/FULPP Decided

    116 Chapel Lane Farnborough Hampshire GU14 9BL

    Continued use of the premises as a hand car wash and valeting facility (sui generis) and erection of acoustic mitigation measures comprising the relocation of noise-generating motors to an internal plant room, the erection of an acoustic screen and associated alterations to the jet washing equipment and forecourt cabling.

    17 Jul 2026 Full applications
  • 26/00443/FUL Awaiting decision

    6A Alexandra Road Farnborough Hampshire GU14 6DA

    Front extension

    4 Aug 2026 Full applications
  • 26/00433/FUL Awaiting decision

    3 Churchill Avenue Aldershot Hampshire GU12 4JR

    Conversion of a garage to a habitable room, erection of a hipped roof on the flat roof of the garage and front door to create a covered porch area

    30 Jul 2026 Full applications
  • 26/00425/FUL Awaiting decision

    Ayling House 16 Ayling Lane Aldershot Hampshire GU11 3LZ

    Erection of a detached outbuilding

    28 Jul 2026 Full applications
  • 25/00257/FULPP Granted

    Flight Safety Building Farnborough Airport Ively Road Farnborough Hampshire GU14 6XA

    Proposed Expansion of Flight Training Facilities to include a new single storey 6 bay Full Flight Simulator Hall with three storey ancillary facilities and external car parking, driveways, landscaped areas and formation of flood compensation area

    7 May 2025 Full applications