Planning application
11 Southampton Street Farnborough Hampshire GU14 6AU
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a single storey rear extension
As published by the council, reference 21/00210/FULPP
Application record
- Reference
- 21/00210/FULPP
- Type
- Full App via planning portal
- Status
- Decided
- Decision
- Permission Granted
- Received
- 23 Mar 2021
- Validated
- 23 Mar 2021
- Decided
- 16 Apr 2021
- Ward
- St Mark's
- Decision by
- Delegated
- Postcode
- GU14 6AU
Timeline
Dates from the published record
-
23 Mar 2021
Received by Rushmoor
-
16 Apr 2021
Decision issued: Permission Granted
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Camberley
57 applications on PlanIndex · across 16 councils · 84% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
12 Southampton Street Farnborough Hampshire GU14 6AX
Erection of a two storey side extension and new porch following demolition of existing porch and garage
Granted Full applications Extension DemolitionSmall domestic -
2A Southampton Street Farnborough Hampshire GU14 6AX
Remove one Fir tree in back garden as per application plan. The tree is within the South Farnborough Conservation Area
Granted Trees 3 docs -
21 Southampton Street Farnborough Hampshire GU14 6AU
Sycamore - lift the canopy of the overhanging tree to no more than 5 metres from ground level and to remove dead, dying or dangerous branches in the canopy overhanging the property (Tree within South Farnborough Conservation Area)
Granted Trees 6 docs -
20 Southampton Street Farnborough Hampshire GU14 6AX
96% historically approved · decision due ~25 Sep
Remove one Lime, T1 on submitted plan. Remove one Apple tree, T2 on plan. The trees are within the South Farnborough Conservation Area
Awaiting decision Trees 3 docs -
Hopedene 28 Southampton Street Farnborough Hampshire GU14 6AX
One Sycamore on rear boundary, reduce height by no more than 3 metres and thin by no more than 25% as per submitted photograph. The tree is within the South Farnborough Conservation Area
Granted Trees 5 docs -
100 Osborne Road Farnborough Hampshire GU14 6AS
96% historically approved · decision due ~30 Jun
Demolition of detached garage and erection of a single storey side/rear extension
Decided Extension Demolition 13 docsSmall domestic
Other full applications applications
In Rushmoor
-
26/00409/FULPP Decided
116 Chapel Lane Farnborough Hampshire GU14 9BL
Continued use of the premises as a hand car wash and valeting facility (sui generis) and erection of acoustic mitigation measures comprising the relocation of noise-generating motors to an internal plant room, the erection of an acoustic screen and associated alterations to the jet washing equipment and forecourt cabling.
-
26/00443/FUL Awaiting decision
6A Alexandra Road Farnborough Hampshire GU14 6DA
Front extension
-
26/00433/FUL Awaiting decision
3 Churchill Avenue Aldershot Hampshire GU12 4JR
Conversion of a garage to a habitable room, erection of a hipped roof on the flat roof of the garage and front door to create a covered porch area
-
26/00425/FUL Awaiting decision
Ayling House 16 Ayling Lane Aldershot Hampshire GU11 3LZ
Erection of a detached outbuilding
-
25/00257/FULPP Granted
Flight Safety Building Farnborough Airport Ively Road Farnborough Hampshire GU14 6XA
Proposed Expansion of Flight Training Facilities to include a new single storey 6 bay Full Flight Simulator Hall with three storey ancillary facilities and external car parking, driveways, landscaped areas and formation of flood compensation area