Skip to content
PlanIndex Get alerts
Menu

Planning application

16 Chestnut Avenue Aldershot Hampshire GU12 4AU

Granted Rushmoor 20/00155/FULPP Full App via planning portal

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey rear extension

As published by the council, reference 20/00155/FULPP

Application record

Reference
20/00155/FULPP
Type
Full App via planning portal
Status
Decided
Decision
Permission Granted
Received
25 Feb 2020
Validated
25 Mar 2020
Decided
8 Apr 2020
Ward
Aldershot Park
Decision by
Service Mananger
Postcode
GU12 4AU

Timeline

Dates from the published record

  1. 25 Feb 2020

    Received by Rushmoor

  2. 25 Mar 2020

    Validated

    Checked as complete and ready for consideration.

  3. 8 Apr 2020

    Decision issued: Permission Granted

  4. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Chestnut Avenue Aldershot Hampshire GU12 4AU

    20/00154/FULPP Submitted 25 Feb 2020 0m away

    Erection of a single storey rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • 2 Chestnut Avenue Aldershot Hampshire GU12 4AU

    26/00354/FULPP Submitted 30 Jun 2026 43m away

    96% historically approved · decision due ~25 Aug

    Retention of existing extensions as built, erection of single-storey front porch and rear extensions and other internal and external alterations to facilitate conversion of existing single dwelling house into two residential units (1X3-bed and 1X1-bed units) [Re-submission of application 25/00223/FULPP refused 20 June 2025]

    Awaiting decision Extension 18 docs
    Small domestic
  • 71 Tongham Road Aldershot Hampshire GU12 4AR

    21/00331/FULPP Submitted 23 Apr 2021 45m away

    Construction of an attached dwelling to the existing semi-detached property to create a terrace of 3 following the demolition of existing detached garage.

    Refused Full applications Demolition 17 docs
    Domestic
  • 67 Tongham Road Aldershot Hampshire GU12 4AR

    24/00624/FUL Submitted 15 Oct 2024 48m away

    Retrospective planning application for the retention of a single storey front and side extension

    Granted Full applications Extension 7 docs
    Small domestic
  • 15 Cedar Close Aldershot Hampshire GU12 4BD

    23/00077/REXPD Submitted 25 Jan 2023 143m away

    Erection of a single storey rear extension measuring 5.5m from the original rear wall, 3m to the eaves and 3.5m in overall height

    Withdrawn Prior approval Extension 12 docs
    Small domestic
  • 16 Cedar Close Aldershot Hampshire GU12 4BD

    25/00684/REXPD Submitted 22 Dec 2025 145m away

    Erection of a single storey rear extension measuring 5.5 metres from the rear wall of the original house x 2.83 metres to the eaves and 2.83 metres overall height

    Granted Prior approval Extension 4 docs
    Small domestic

In Rushmoor

  • 26/00409/FULPP Decided

    116 Chapel Lane Farnborough Hampshire GU14 9BL

    Continued use of the premises as a hand car wash and valeting facility (sui generis) and erection of acoustic mitigation measures comprising the relocation of noise-generating motors to an internal plant room, the erection of an acoustic screen and associated alterations to the jet washing equipment and forecourt cabling.

    17 Jul 2026 Full applications
  • 26/00443/FUL Awaiting decision

    6A Alexandra Road Farnborough Hampshire GU14 6DA

    Front extension

    4 Aug 2026 Full applications
  • 26/00433/FUL Awaiting decision

    3 Churchill Avenue Aldershot Hampshire GU12 4JR

    Conversion of a garage to a habitable room, erection of a hipped roof on the flat roof of the garage and front door to create a covered porch area

    30 Jul 2026 Full applications
  • 26/00425/FUL Awaiting decision

    Ayling House 16 Ayling Lane Aldershot Hampshire GU11 3LZ

    Erection of a detached outbuilding

    28 Jul 2026 Full applications
  • 25/00257/FULPP Granted

    Flight Safety Building Farnborough Airport Ively Road Farnborough Hampshire GU14 6XA

    Proposed Expansion of Flight Training Facilities to include a new single storey 6 bay Full Flight Simulator Hall with three storey ancillary facilities and external car parking, driveways, landscaped areas and formation of flood compensation area

    7 May 2025 Full applications