Skip to content
PlanIndex Get alerts
Menu

Planning application

The Savill Building Wick Lane Englefield Green Surrey TW20 0UU

Awaiting decision Runnymede RU.26/1162

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details pursuant to Discharge Condition 5 (Arboricultural Method Statement) of planning permission RU.24/0424 Proposed temporary Light Trail Event, starting and ending from The Savill Garden Visitor Centre Car Park and circumnavigating the Obelisk Pond along established footpaths/tracks. Taking place from mid-November (installation commencing in October) to early January (breakdown completing in mid-January) in 2024, 2025, 2026, 2027 and 2028.

As published by the council, reference RU.26/1162

Application record

Reference
RU.26/1162
Status
REGISTERED
Postcode
TW20 0UU

Site history

Applications at this address on the Runnymede register

This site has had 3 applications since 2025: 1 approved, 0 refused.

  • RU.25/1139 Granted

    The Savill Building Wick Lane Englefield Green Surrey TW20 0UU

    Details pursuant to Discharge Condition 10 (Details of Noise and lighting Assessment) of planning permission RU.24/0424 for the Proposed temporary Light Trail Event, starting and ending from The Savill Garden Visitor Centre Car Park and circumnavigating the Obelisk Pond along established footpaths/tracks. Taking place from mid-November (installation commencing in October) to early January (breakdown completing in mid-January) in 2024, 2025, 2026, 2027 and 2028

    Decided 23 Sep 2025 Conditions
  • RU.26/1112 Awaiting decision

    The Savill Building Wick Lane Englefield Green Surrey TW20 0UU

    Details pursuant to discharge condition 8 (Future layout and opening days of event), 9 (Ecological Appraisal), 10 (Details of Noise and lighting Assessment), 11 (Details of Noise Barrier), 12 (Monitoring) of planning permission RU.24/0424 (Proposed temporary Light Trail Event, starting and ending from The Savill Garden Visitor Centre Car Park and circumnavigating the Obelisk Pond along established footpaths/tracks. Taking place from mid-November (installation commencing in October) to early January (breakdown completing in mid-January) in 2024, 2025, 2026, 2027 and 2028).

Timeline

Dates from the published record

  1. 9 Sep 2026

    Added to PlanIndex

  2. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

    Runnymede took a median of 46 days over the applications it decided in the last year.

What happens while it is decided

This application is with Runnymede for determination, against a statutory target of eight weeks. Over the last year Runnymede's median decision took 46 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Runnymede's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • The Savill Building Wick Lane Englefield Green Surrey TW20 0UU

    RU.26/1112 0m away

    80% historically approved

    Details pursuant to discharge condition 8 (Future layout and opening days of event), 9 (Ecological Appraisal), 10 (Details of Noise and lighting Assessment), 11 (Details of Noise Barrier), 12 (Monitoring) of planning permission RU.24/0424 (Proposed temporary Light Trail Event, starting and ending from The Savill Garden Visitor Centre Car Park and circumnavigating the Obelisk Pond along established footpaths/tracks. Taking place from mid-November (installation commencing in October) to early January (breakdown completing in mid-January) in 2024, 2025, 2026, 2027 and 2028).

    Awaiting decision
  • The Savill Building Wick Lane Englefield Green Surrey TW20 0UU

    RU.25/1139 Submitted 20 Aug 2025 1m away

    Details pursuant to Discharge Condition 10 (Details of Noise and lighting Assessment) of planning permission RU.24/0424 for the Proposed temporary Light Trail Event, starting and ending from The Savill Garden Visitor Centre Car Park and circumnavigating the Obelisk Pond along established footpaths/tracks. Taking place from mid-November (installation commencing in October) to early January (breakdown completing in mid-January) in 2024, 2025, 2026, 2027 and 2028

    Granted Conditions 4 docs
  • The Savill Building Wick Lane Englefield Green TW20 0UU

    RU.21/1646 Submitted 22 Sep 2021 1m away

    Non-material amendment to condition 2 (approved drawings) of planning approval RU.21/1095 to allow for changes to the glazed entrance doors of the consented extension to the Savill Building.

    Granted Conditions Extension Windows or glazing 8 docs