Planning application
land off Morthen Lane Morthen 9999
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction, operation, and subsequent decommissioning of a renewable energy park, comprising ground mounted solar photovoltaic (PV) together with associated infrastructure including inverters, substation compound, cabling, access tracks, fencing, and landscaping
As published by the council, reference RB2025/0714
Application record
- Reference
- RB2025/0714
- Type
- Full
- Status
- Valid
- Received
- 22 May 2025
- Validated
- 6 Jun 2025
- Ward
- Sitwell Ward
- Parish
- Whiston
- Decision by
- Proposed to be Committee
Timeline
Dates from the published record
-
22 May 2025
Received by Rotherham
-
6 Jun 2025
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Rotherham took a median of 52 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
280 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Rotherham for determination, against a statutory target of eight weeks. Over the last year Rotherham decided full applications in a median of 101 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Morthen House Morthen Lane Morthen 9999
Permission in Principle for construction of a dwellinghouse
Refused Outline 13 docsDomestic -
land south of The White House Morthen Lane Morthen 9999
Erection of 3 self build detached dwellinghouses
Granted New dwelling 26 docs -
Vale Farm Morthen Hall Lane Morthen 9999
Discharge of Biodiversity Gain Plan imposed by RB2024/1769
Granted Conditions 2 docs -
Vale Farm Morthen Hall Lane Morthen 9999
Discharge of condition 5 imposed by planning application RB2024/1769
Granted Conditions 4 docs -
Vale Farm Morthen Hall Lane Morthen 9999
Demolition of structure and erection of detached stable block
Granted Other Demolition 10 docs -
Sitwell Cottage Morthen Hall Lane Morthen 9999
Non-material amendment to RB2023/0107 to approved plans
Granted Amendments 3 docs
Other full applications
In Rotherham
-
RB2025/0945 Granted
Land between Barnsley Road and Pontefract Road Brampton Bierlow 9999
Application to vary numerous conditions to reflect amendments approved under S96a and to rationalise the conditions to take account of the passage of time since the original permission imposed by application RB2022/0295. This will include proposed amendments to condition 07 (pedestrian refuge)
-
RB2024/1621 Granted
land at Haugh Road Rawmarsh 9999
Erection of 13 dwellings and garages
-
RB2025/1060 Granted
underpass at Europa Link, Poplar Way, Highfield Spring and Brunel Way Catcliffe 9999
Installation of extension to the existing District Heating Network, including above and below ground pipework system, above ground structures, landscaping, and works
-
RB2025/0943 Granted
Waverley New Community off High Field Spring Catcliffe 9999
Application to vary condition 1(amendment to proposed finished floor levels & reduction in build heights) imposed by Planning Application RB2022/1510
-
RB2023/0720 Granted
WaverleyNew Community off High Field Spring Catcliffe 9999
Discharge of conditions 1, 2, 4-9, 11, 12(a), 14-16, 20-27 imposed by planning application RB2022/1275