Planning application
2 Farm Cottages Stubbins Vale Road Ramsbottom Bury Lancashire BL0 0NS
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Larger Home Extension: Erection of single storey rear extension extending beyond the rear wall of the original house by 3.6m, with a maximum height of 2.6m and an eaves height of 2.4m when measured from the natural ground level.
As published by the council, reference 2019/0531
Application record
- Reference
- 2019/0531
- Type
- Prior Approval for Larger Home Extension
- Status
- Decided
- Decision
- Prior Approval Not Required
- Received
- 11 Nov 2019
- Validated
- 19 Nov 2019
- Decided
- 23 Dec 2019
- Ward
- Historic - Eden
- Decision by
- Delegated Decision
- Postcode
- BL0 0NS
Timeline
Dates from the published record
-
11 Nov 2019
Received by Rossendale
-
19 Nov 2019
Validated
Checked as complete and ready for consideration.
-
23 Dec 2019
Decision issued: Prior Approval Not Required
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
73 applications on PlanIndex · across 5 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Rossendale granted permission on 23 December 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
114 Chatterton Road Ramsbottom Bury Lancashire BL0 0PQ
Householder: Construction of single storey rear extension
Granted Householder Extension 8 docsSmall domestic -
Stubbins Graveyard Bolton Rd North Edenfield BL0 0NA
T5 - Suffering AshDieback ( we have recently removed 8 similar trees under decision notice TPO 2021/022) T31 - Dead Lime Tree - this tree did not leaf throughout last year and is indicating signs of rot T27 - Whilst good generally there are 2 large branches, relatively low down 1off overhanging public pavement and the other overhanging the graveyard both of which appear to be 'dropping' and should be removed.
Refused Trees 4 docs -
Graveyard Bolton Road North Edenfield Bury Lancashire BL0 0NA
See attached Report
Granted Trees 2 docs -
9 Croft End Place Ramsbottom Bury Lancashire BL0 0AF
87% historically approved · decision due ~5 Aug
Householder: Conversion of an integral garage area of 4 bed dwelling to create a new ensuite bedroom & remove an area of grass verge at the front to replace with hard standing to accommodate a vehicle
Decided 7 docsDomestic
Other prior approval applications
In Rossendale
-
2026/0164 Refused
Higher Mount Pleasant Gincroft Lane Edenfield Bury Lancashire BL0 0GQ
Agricultural cattle buildings - 30m x 28m, measuring 4.8m to the eaves - a steel portal frame with concrete shutter walls and timber boards above with corrugated sheets to the roof.
-
2026/0169 Granted
Athertonholme Mill Railway Street Stacksteads Bacup Lancashire OL13 0UF
Prior Notification: The demolition of an existing freestanding masonry chimney stack.
-
2026/0113 Granted
Farmland To The West Of A56 Edenfield Bury Lancashire BL0 0QJ
Prior Notification: Tracks required to access fields that are too wet and boggy to access without a track in place. Access required for boundary maintenance, weed control, hay-making and livestock care.
-
2026/0129 Granted
Agricultural Building At Whitaker Clough Farm Burnley Road Bacup Lancashire OL13 8RQ
Prior Notification: Retrofit and repair existing agricultural building used for storage
-
2024/0426 Granted
Reddish Hill Farm Market Street Shawforth Rochdale Lancashire OL12 8XD
Prior Approval for change of use and associated operational development of agricultural buildings to form 2 'larger' dwellinghouses