Skip to content
PlanIndex Get alerts
Menu

Planning application

Rochdale AGI Norman Road Rochdale OL12 6XE

Granted Rochdale 20/00218/DEM Prior Notification - Demolition

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior approval for the demolition of existing storage building

As published by the council, reference 20/00218/DEM

Application record

Reference
20/00218/DEM
Type
Prior Notification - Demolition
Status
Decided
Decision
Grant subject to conditions
Received
21 Feb 2020
Validated
21 Feb 2020
Decided
19 Mar 2020
Ward
Milkstone And Deeplish
Parish
Rochdale Township
Decision by
Fully Delegated
Postcode
OL12 6XE

Timeline

Dates from the published record

  1. 21 Feb 2020

    Received by Rochdale

  2. 19 Mar 2020

    Decision issued: Grant subject to conditions

  3. 17 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

302 applications on PlanIndex · across 80 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • Land At The Junction Of Dane Street And Mellor Street, Rochdale

    20/00482/TELE Submitted 4 May 2020 61m away

    Prior notification for the erection of a 20m high Phase 8 Monopole with C/W wraparound cabinet at base and associated ancillary works

    Refused Telecoms 8 docs
  • Dane Street Rochdale OL11 2EZ

    19/01145/FUL Submitted 27 Sep 2019 61m away

    Replacement of existing 11.7m high monopole with 20m monopole, together with equipment cabinets and ancillary development

    Refused Full applications 13 docs
  • Dane Street Rochdale OL11 4EZ

    19/01144/TELE Submitted 27 Sep 2019 70m away

    Prior approval for the installation of a 20 metre high phase 5 Monopole and associated works

    Refused Telecoms 10 docs
  • Alleyway To Side Of 61 And Rear Of 73 Bridgefield Street Rochdale OL11 4EY

    20/00656/FUL Submitted 12 Jun 2020 74m away

    Erection of 2 x 2m high free standing pedestrian access alleygate to side of 61 and rear of 73 Bridgefield Street including associated fencing.

    Granted Full applications 13 docs
  • Unit 3, Mellor Street, Rochdale, OL12 6XD

    PL/2026/0656 Submitted 5 Aug 2026 104m away

    89% historically approved · decision due ~30 Sep

    One internally illuminated fascia sign, one non-illuminated totem sign and one non-illuminated logo sign

    Awaiting decision Advertising 4 docs
  • 9 Briar Street Rochdale OL11 4HD

    20/01181/HOUS Submitted 25 Sep 2020 142m away

    Single storey rear extension following demolition of existing single storey rear extension

    Granted Householder Extension Demolition 10 docs
    Small domestic

In Rochdale

  • NOT/2026/0620 Granted

    Land at C Norris Springs Ltd, Lady House Works, Milnrow, OL16 4JD

    Prior notification for the installation of a 20m lattice tower with an open headframe supporting, 12 no. antennas, 4 no. 0.3m transmission dishes, along with 2 no. equipment cabinets, 1 no. electric meter cabinet and ancillary development thereto including 30 no. Ericsson Radio Systems (ERS’s), contained within a 2m high palisade fence

    9 Jul 2026 Prior approval
  • NOT/2026/0774 Awaiting decision

    41 Channing Street, Rochdale, OL16 5PY

    Prior approval for a larger homes extension measuring 4.5m from the rear (with a maximum height of 3.6m and height to eaves 2.52m)

    28 Aug 2026 Prior approval
  • NOT/2026/0489 Granted

    SUDDEN MILL, MANCHESTER ROAD, ROCHDALE, OL11 4QR

    Prior approval for conversion of ground floor commercial/business use to form 3no. apartments

    17 Jun 2026 Prior approval
  • NOT/2026/0623 Granted

    198 HEYWOOD OLD ROAD, MIDDLETON, MANCHESTER, M24 4GR

    Prior approval for a proposed single storey rear extension measuring 4m from the original dwelling (with a maximum height of 4m and height to eaves 2.53m)

    9 Jul 2026 Prior approval
  • 25/00849/DEM Granted

    Regent Mill St James Street Heywood OL10 1JJ

    Prior notification of the proposed demolition of existing mill building

    28 Nov 2025 Prior approval