Planning application

2, Mount Ararat Road, Richmond, TW10 6PA

Granted Richmond upon Thames PA26/0365 Removal or variation of a condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of planning approval PA25/2668 - Conditions C5 - Approved Drawing Numbers, C6 - Construction Management Statement, and C2 Materials app as the main basement works are no longer planned.

As published by the council, reference PA26/0365

Application record

Reference
PA26/0365
Type
Removal or variation of a condition
Status
Decided
Decision
Granted Permission
Received
3 Feb 2026
Validated
5 Feb 2026
Decided
10 Mar 2026
Ward
South Richmond Ward [STR]
Decision by
Delegated Decision
Postcode
TW10 6PA

Timeline

Dates from the published record

  1. 3 Feb 2026

    Received by Richmond upon Thames

  2. 5 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Mar 2026

    Decision issued: Granted Permission

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

In Richmond upon Thames

  • PA26/2322 Refused

    10 Princes Road Kew Richmond TW9 3HP

    Variation of planning reference PA25/3147 to vary the condition C3 (Materials to match existing) to render the existing brick work.

    2 Jul 2026 Amendments
  • PA26/2816 Granted

    Meadows Hall, Church Road, Richmond, TW10 6LN

    Non material amendment to planning reference 22/3112/FUL - To phase the proposed development and to amend the following pre-commencement conditions to align with said phasing of works on site: Conditions 43 (Construction Method Statement), 44 (CEMP), 45 (Construction Logistics Plan), 46 (Ecology Report), 48 (Detailed Drainage Design), 49 (Submitted Arboricultural Details) and 52 (Heads of Terms) and remove Condition 53 (Sale of Land).

    12 Aug 2026 Amendments
  • PA26/3000 Awaiting decision

    283, Lower Richmond Road, Richmond, TW9 4LU

    Rear dormer alterations, rooflights to front elevation, front garden alterations. [Non-material amendment to planning permission PA26/1424 to allow change to approved external cladding of the rear dormer from clay tiles to slate.]

    28 Aug 2026 Amendments
  • PA26/1893 Granted

    46 Park House Gardens Twickenham TW1 2DE

    Variation of approved drawing condition C4 Approved Drawings to allow for a silicone render finish of the dormer and the Removal of Condition C3 Window Obscure Glazed - Non openable to allow on the side elevation of the roof extension to be clear glazed and openable of planning application PA25/1070

    1 Jun 2026 Amendments
  • PA26/2704 Granted

    2 - 2A St Peters Road Twickenham

    Non material amendment to planning reference PA25/2481 to allow for minor design changes to the 4 dormer windows

    4 Aug 2026 Amendments