Skip to content
PlanIndex Get alerts
Menu

Planning application

14 Kew Green Kew Richmond TW9 3BH

Granted Richmond upon Thames PA25/3943 Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed part single storey and part 2 storey rear extension.

As published by the council, reference PA25/3943

Application record

Reference
PA25/3943
Type
Full Application
Status
Decided
Decision
Granted Permission
Received
31 Oct 2025
Validated
13 Nov 2025
Decided
23 Dec 2025
Ward
Kew Ward [KWW]
Decision by
Delegated Decision
Postcode
TW9 3BH

Timeline

Dates from the published record

  1. 31 Oct 2025

    Received by Richmond upon Thames

  2. 13 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Dec 2025

    Decision issued: Granted Permission

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Kew Green Kew Richmond Upon Thames TW9 3BH

    05/T0295/TCA Submitted 13 Apr 2005 8m away

    T1 - Fig (Ficus spp.) - Remove 3 x right hand limbs overhanging wall.

    Granted Trees
  • 10B Kew Green Kew Richmond Upon Thames TW9

    05/3175/FUL Submitted 20 Oct 2005 12m away

    Cowl on existing extraction ducting.

    Granted Full applications
  • 3 Gloucester Road Kew Richmond TW9 3BS

    PA25/4042 Submitted 10 Nov 2025 27m away

    Installation of an EV Charger outside the front door on the brick wall to the right.

    Granted Householder 11 docs
    Domestic
  • 3 Gloucester Road Kew Richmond TW9 3BS

    24/T0906/TCA Submitted 23 Oct 2024 28m away

    REAR GARDEN T1 Leyland cypress (x Cuprocyparis leylandii) Fell to ground level as too big for the garden as outgrown its location.

    Granted Trees 2 docs
  • 22 Kew Green Kew Richmond Upon Thames TW9 3BH

    05/3077/LBC Submitted 3 Oct 2005 29m away

    Alterations to the layout of the basement (including removal of stud walls).

    Granted Heritage and listed buildings 6 docs
  • 22 Kew Green Kew Richmond TW9 3BH

    PA25/3434 Submitted 30 Sep 2025 32m away

    Tree A: is an overlarge fig, close to our house. Application is to reduce the crown by one third, to tidy up a couple of low branches which now overhang ours and our neighbour's garden, blocking light, in order to keep the tree in a healthy condition and shape. Tree B: is a false acacia which has grown far too tall in its competitive effort to reach the light. Application is to reduce the crown by one third including tidying up some of the lower branches. Tree C: is a hornbeam. Application is to reduce the crown by one third. All three are part of normal maintenance for these trees not least since trees A & B are both, in reality, too large for a garden of our size. We have planted 4 new trees in 2025 which are of a more appropriate size. Tree A - Fig: a 2m crown reduction in width and a 2m reduction in height, leaving a canopy spread of approximately 4m and height of 5m. Tree B - False Acacia: a 2m crown reduction in width and a 2.5m reduction in height, leaving a canopy spread of approximately 4m and height of 6.5m. Tree C - Hornbeam: a 1.5m crown reduction in width and a 2m crown reduction in height leaving a canopy spread of approximately 4m and height of 5.5m.

    Granted Trees 3 docs

In Richmond upon Thames

  • PA26/2323 Granted

    112, Teddington Park Road, Teddington, TW11 8NE

    Single storey rear extension to existing ground floor flat.

    26 Jun 2026 Full applications
  • PA26/3069 Awaiting decision

    21, Flat 1b, Cardigan Road, Richmond, TW10 6BJ

    Ground floor flat rear extension including the demolition of existing extension/s and erection of new single storey rear extension and associated internal remodelling.

    3 Sep 2026 Full applications
  • PA26/3051 Awaiting decision

    21 and 23 Winchester Road, Twickenham

    Raising of the ridge and eaves, replacement of front and rear roof slopes and the erection of rear dormer extensions to the rear roof slope and outrigger to each property.

    2 Sep 2026 Full applications
  • PA26/2350 Refused

    Garden Flat 39 Onslow Road Richmond TW10 6QH

    Formation of new garden outbuilding.

    6 Jul 2026 Full applications
  • PA26/3033 Awaiting decision

    Teddington Swimming Pool, Vicarage Road, Teddington, TW11 8EZ

    Full planning permission for: replacement of gas-fired boilers with air source heat pumps to provide heating and hot water; installation of a rooftop air source heat pump acoustic compound; installation of solar PV panels; recovering of existing flat roof sections (excluding pool hall roof); and internal first floor modifications to provide access into the rooftop air source heat pump acoustic compound via a new door.

    1 Sep 2026 Full applications