Planning application
Hammersmith Bridge, W4
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of condition 13 (reinstatement timeframe) of planning application 2021/03969/VLC granted 25th February 2022 to extend the timescale for reinstatement and repainting of those elements of the bridge affected by the works by a further 5 years.
As published by the council, reference PA25/3429
Application record
- Reference
- PA25/3429
- Type
- Consultation Other
- Status
- Decided
- Decision
- Raise No objection
- Received
- 29 Sep 2025
- Validated
- 29 Sep 2025
- Decided
- 13 Oct 2025
- Ward
- Out of Borough
- Decision by
- Delegated Decision
Site history
Applications at this address on the Richmond upon Thames register
This site has had 3 applications since 2025: 3 approved, 0 refused.
-
PA25/3428 Granted
Hammersmith Bridge, W4
Variation of condition 6 (Transport and Storage) to amend the storage location from 191 Tunnel Avenue London SE10 0GR to FM Conway, Asphalt Plant, 20 New Road, Newhaven, BN9 0EH of planning application 2021/03969/VLBC granted 25th February 2022.
-
PA25/3430 Granted
Hammersmith Bridge, W4
Variation of condition 6 (Transport and storage) to amend the storage location from 191 Tunnel Avenue, London SE10 0GR to FM Conway, Asphalt Plant, 20 New Road, Newhaven, BN9 0EH and condition 12 (reinstatement timeframe) to extend the timescale for reinstatement and repainting of those elements of the bridge affected by the works by a further 5 years of planning application 2022/01109/VLBC granted 6th June 2022.
Timeline
Dates from the published record
-
29 Sep 2025
Received by Richmond upon Thames
-
13 Oct 2025
Decision issued: Raise No objection
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Richmond upon Thames granted permission on 13 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Hammersmith Bridge, W4
Variation of condition 6 (Transport and Storage) to amend the storage location from 191 Tunnel Avenue London SE10 0GR to FM Conway, Asphalt Plant, 20 New Road, Newhaven, BN9 0EH of planning application 2021/03969/VLBC granted 25th February 2022.
Granted Outline 3 docs -
Hammersmith Bridge, W4
Variation of condition 6 (Transport and storage) to amend the storage location from 191 Tunnel Avenue, London SE10 0GR to FM Conway, Asphalt Plant, 20 New Road, Newhaven, BN9 0EH and condition 12 (reinstatement timeframe) to extend the timescale for reinstatement and repainting of those elements of the bridge affected by the works by a further 5 years of planning application 2022/01109/VLBC granted 6th June 2022.
Granted Outline 3 docs -
Hammersmith Bridge, Castelnau, Barnes
81% historically approved · decision due ~19 Sep
Variation of condition U0121188 - reinstatement timeframe, pursuant to listed building consent 21/3954/LBC and 22/1231/VRC
Awaiting decision Amendments 4 docs -
Hammersmith Bridge, Castelnau, Barnes
81% historically approved · decision due ~19 Sep
Variation of conditions 'U007316 Transport and Storage' and 'U0073171 Reinstatement Timeframe' of application 21/3738/VRC associated with 19/2813/LBC.
Awaiting decision Amendments 4 docs -
Hammersmith Bridge London
95% historically approved · decision due ~3 Sep
Variation of condition 6 (Transport and Storage) to amend the storage location from 191 Tunnel Ave, London, SE10 0GR to FM Conway, Asphalt Plant, 20 New Road Newhaven, BN9 0EH and condition 12 (Reinstatement timeframe) to extend the timescale for reinstatement and repainting of those elements of the bridge affected by the works by a further 5 years of planning application ref: 2022/01109/VLBC granted 6th June 2022.
Awaiting decision Conditions 11 docs -
Hammersmith Bridge London
95% historically approved · decision due ~15 Sep
Variation of condition 6 (Transport and Storage) to amend the storage location from 191 Tunnel Ave, London, SE10 0GR to FM Conway, Asphalt Plant, 20 New Road Newhaven, BN9 0EH of planning application ref: 2021/03969/VLBC granted 25th February 2022.
Awaiting decision Conditions 23 docs
Other outline applications
In Richmond upon Thames
-
PA26/3074 Awaiting decision
COMO HOUSE WARWICK ROAD HAMPTON WICK KT1 4DW
Change of use of the existing office building from Class E to Class C3, to create 3No. new dwellings
-
PA26/3047 Awaiting decision
2, Hurst Road, East Molesey, KT8 9AF
Roof extension to provide rooms in the roofspace including side rooflights. (Elmbridge ref 2026/1939).
-
PA26/2881 Awaiting decision
1-3, Sussex Place, London, W6 9EA
Demolition of existing building and redevelopment of the site comprising the erection of a 14-storey (plus basement) building to provide purpose built student accommodation, comprising of 291 student bedrooms; associated communal facilities, roof terrace, cycle parking, refuse storage and landscaping.
-
PA26/2257 Refused
83-105 Ham Street, Ham, TW10 7HL
Application for prior notification of development for a single-storey rooftop extension above the detached flatted building to provide residential flats.
-
PA26/2838 Awaiting decision
Unit 18, Falstaff House, Bardolph Road, London, TW9 2LE
Application for determination for Prior Approval for change of use of office floorspace (Class E) to provide 1 residential flat (Class C3).