Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0469/OUT

135 Morien Crescent Rhydyfelin Pontypridd Rhondda Cynon Taf CF37 5PT

Awaiting decision Rhondda Cynon Taf Outline Application

Proposal

Outline planning application for construction of additional detached dwelling within the curtilage of 135 Morien Crescent, with off street parking.

As published by the council, reference 26/0469/OUT

Timeline

Dates from the published record

  1. 28 May 2026

    Received by Rhondda Cynon Taf

  2. 11 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Rhondda Cynon Taf for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 25/0942/FUL Awaiting decision

    150 Morien Crescent Rhydyfelin Pontypridd Rhondda Cynon Taf CF37 5PT

    Conversion of existing outside toilet/storage area to a room containing level access shower/WC/WHB

    9 Sep 2025 129m away Full applications
  • 25/1181/FUL Granted

    10B Park Street Treforest Pontypridd Rhondda Cynon Taf CF37 1SN

    Change of use from A2 to A3 use to operate a Bubble Tea Shop (plus Café), addition of a shutter door to the front and new signage.

    21 Nov 2025 442m away Full applications
  • 26/0149/LBC Awaiting decision

    Upper Glyntaff Campus, The Alfred Russel Wallace Building Cemetery Road Glyn-Taf Pontypridd CF37 4BD

    Partial demolition of the chimney stack serving the rear western wing of the Alfred Russel Wallace Building.

    20 Feb 2026 479m away Heritage and listed buildings
  • 26/0035/LBC Granted

    Machine Bridge North Broadway Treforest Pontypridd CF37 1DB

    Listed Building Consent for investigative survey works at Machine Bridge North, including targeted structural investigations to assess the condition of the reinforced concrete elements of the Machine Bridge and temporary opening-up of the bridge fabric at specified locations (Retrospective).

    20 Jan 2026 479m away Heritage and listed buildings

In Rhondda Cynon Taf

  • 26/0577/SSO Awaiting decision

    Carreg Wen

    EIA Scoping Direction

    30 Jun 2026 Outline
  • 26/0372/OUT Awaiting decision

    Land South Of A473 Talbot Green Pontyclun

    Outline application with all matters reserved apart from means of access for the erection of up to 180 dwellings with all associated open space, landscaping, drainage, engineering and servicing.

    30 Apr 2026 Outline
  • 26/0324/OUT Awaiting decision

    Parcel Of Land To Rear Of 15 And 16 Hospital Road, Pontypridd.

    Outline planning permission with all matters reserved for the construction of a single detached dwellinghouse with external parking and private garden.

    17 Apr 2026 Outline
  • 26/0216/SSO Decided

    Carreg Wen

    Screen/Scoping

    11 Mar 2026 Outline
  • 26/0094/SSO Decided

    LAND AT TIR-Y-GELLI FARM, YNYSYWBWL, PONTYPRIDD, CF37 3PG

    The intention is to make a planning application for full planning permission for the construction, operation, maintenance and decommissioning of a ground mounted solar farm with an export capacity of circa 33MW, complete with landscaping, associated infrastructure, and the provision of access and operational access tracks.

    3 Feb 2026 Outline