Skip to content
PlanIndex Get alerts
Menu

Planning application

Vacant Land Off Meirion Street Aberdare Rhondda Cynon Taf

Awaiting decision Rhondda Cynon Taf 26/0201/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of 4no detached houses together with associated service road, drainage and new access to Meirion Street and adjoining existing bungalows

As published by the council, reference 26/0201/FUL

Application record

Reference
26/0201/FUL
Type
Full Application
Status
Pending Decision
Received
5 Mar 2026
Validated
10 Apr 2026
Ward
Aberdare West And Llwydcoed

Timeline

Dates from the published record

  1. 5 Mar 2026

    Received by Rhondda Cynon Taf

  2. 10 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 5 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Rhondda Cynon Taf took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

  • HENEB RESPONSE CONSULTN · 02 Jun 2026
  • FLOOD RISK MANAGEMENT (FRM) / LEAD LOCAL FLOOD AUTHORITY (LLFA) CONSULTN · 08 May 2026
  • NRW CONSULTN · 06 May 2026
  • PUBLIC PROTECTION CONSULTN · 29 Apr 2026
  • HIGHWAYS RESPONSE CONSULTN · 28 Apr 2026
  • WELSH WATER CONSULTN · 24 Apr 2026
  • THE COAL AUTHORITY CONSULTN · 20 Apr 2026
  • NATIONAL GAS CONSULTN · 17 Apr 2026
  • NATIONAL GRID CONSULTN · 16 Apr 2026
  • SITE LAYOUT AMDPLAN · 10 Apr 2026
  • APP FORM Application Form · 05 Mar 2026
  • LOCATION PLAN PLAN · 05 Mar 2026
  • SITE SURVEY PLAN · 05 Mar 2026
  • SITE LAYOUT PLAN · 05 Mar 2026
  • ELEVATIONS AND HOUSE LAYOUTS PLAN · 05 Mar 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Rhondda Cynon Taf for determination, against a statutory target of eight weeks. Over the last year Rhondda Cynon Taf decided full applications in a median of 61 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Rhondda Cynon Taf

  • 25/1114/FUL Granted

    Ynyscrug Livery Yard, Pant Y Brad, Tonyrefail, CF39 8HX

    Erection of a permanent rural workers dwelling

    4 Nov 2025 Full applications
  • 26/0194/FUL Granted

    Land To The North-East Of Lan Farm Pen-y-wal Road To Lan Quarry Graig-wen Pontypridd Rhondda Cynon Taf CF37 3NN

    Installation of a garden pod and retrospective installation of polytunnel (Amended site location plan and ownership certificate received 25/06/2026).

    3 Mar 2026 Full applications
  • 26/0451/FUL Granted

    7 Weston Road Edmondstown Tonypandy Rhondda Cynon Taf CF40 1NX

    Proposed construction of a first floor Bedroom extension on top of existing Kitchen extension and construction of a single domestic garage.

    26 May 2026 Full applications
  • 26/0620/FUL Granted

    20 Thistle Terrace Thomas Street Tonypandy Rhondda Cynon Taf CF40 2AD

    Garage to rear of the garden.

    15 Jul 2026 Full applications
  • 26/0219/FUL Granted

    35 Charles Street Tonypandy Rhondda Cynon Taf CF40 2AN

    Replacement of raised timber decking structure to rear garden (retrospective)(amended plans received 13/07/2026)

    12 Mar 2026 Full applications