Planning application
Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Conditions 31 (Engineering Detials and Design Highways Works) of planning permission 22/0676/10 (Amended Plans Rec. 17/10/25)
As published by the council, reference 25/0419/DIS
Application record
- Reference
- 25/0419/DIS
- Type
- Discharge of Condition/s
- Status
- Pending Decision
- Received
- 11 Apr 2025
- Validated
- 11 Apr 2025
- Ward
- Aberdare East
- Postcode
- CF44 0RF
Site history
Applications at this address on the Rhondda Cynon Taf register
This site has had 4 applications since 2025: 2 approved, 0 refused.
-
25/1247/NMA Granted
Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF
Proposed non-material amendment application to vary Condition 2 (Approved Plans) of planning permission 22/0676/10
-
25/0871/DIS Granted
Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF
Discharge of Condition 8 (Levels) of planning permission 22/0676/10.
-
25/0416/DIS Awaiting decision
Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF
Discharge of Condition 11 (Drainage) of planning permission 22/0676/10 (Additional Info Rec. 12/12/25)
Timeline
Dates from the published record
-
11 Apr 2025
Received by Rhondda Cynon Taf
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Rhondda Cynon Taf took a median of 58 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 22/0676/FUL (Decided)
Who's behind it
Company information only, from the register and Companies House
Asbri Planning Ltd. Agent, a planning consultancy registered in Bridgend
Active · incorporated 2007 · Bridgend
1,169 applications on PlanIndex · across 25 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
112 documents on file for this application
- 2466-104-2-E SECTION 38
- 2466-105-1-E SECTION 38 LAYOUT PHASE 2 SOUTH SHEET 1 OF 2
- 2466-105-2-D-SECTION 38 LAYOUT PHASE 3 NORTH SHEET 2 OF 2
- 2466-106-1-D - LONGITUDINAL SECTIONS PHASE 1 SOUTH
- 2466-106-2-D - LONGITUDINAL SECTIONS PHASE 1 SOUTHEAST
- 2466-106-2-E - LONGITUDINAL SECTIONS PHASE 1 SOUTHEAST
- 2466-106-3-D - LONGITUDINAL SECTIONS PHASE 1 SOUTH WEST
- 2466-106-3-E - LONGITUDINAL SECTIONS PHASE 1 SOUTH WEST
- 2466-LANDSCAPE TREATMENT
- 2466-107-2-F LONGITUTINAL SECTIONS - PHASE 2 NORTH 2OF3
- 2466-107-3-C - LONITUDINAL SECTIONS PHASE 2 NORTH 3OF3
- 2466-107-3-D - LONGITUDINAL SECTIONS - PHASE 2 NORTH 3OF 3
- 2466-108 TYPICAL DRAINAGE CONSTRUCTION DETAILS - SECTION 104
- 2466-109-4-B MANHOLE SCHEDULES - CATCHMENT B
- 12580 ABERDARE HOSPITAL POST DEMOLITION GEOENVIRONMENTAL SITE INVESTIGATION REPO
- 12580 ABERDARE HOSPITAL POST DEMOLITION SITE INVESTIGATION REPORT
- 2466-100-1-R ENGINEERING LAYOUT PHASE 1 - SHEET 1 OF 5
- 2466-100-2-N ENGINEERING LAYOUT PHASE 1 - SHEET 2 OF 5
- 2466-100-3-P ENGINEERING LAYOUT PHASE 1 - SHEET 2 OF 5
- 2466-100-4P ENGINEERING LAYOUT PHASE 1 - SHEET 4 OF 5
- 2466-100-5-G ENGINEERING LAYOUT PHASE 1 - SHEET 5 OF 5
- 2466-101-1-J ENGINEERING LAYOUT PHASE 2 SHEET 1 OF 4
- 2466-101-2- G ENGINEERING LAYOUT PHASE 2 SHEET 2 OF 4
- 2466-101-3-E ENGINEERING LAYOUT PHASE 2 SHEET 3 OF 4
- 2466-101-4-K ENGINEERING LAYOUT PHASE 2 SHEET 4 OF 4
- 2466-104-1-E SECTION 38 LAYOUT PHASE 1 SOUTH SHEET 1 OF 2
- 2466-107-2-E LONGITUDINAL SECTIONS - PHASE 2 NORTH 2 OF 3
- 2466-107-1-B LONGITUDINAL SECTIONS PHASE 2 NORTH 1 OF 3
- 200710-WDL-TN001 THINK URBAN DRAINAGE STRATEGY
- 200710-WDL-D-011 B EXISTING AND PROPOSED IMPERMEABLE AREA PLAN
- 2466-104-1-G SECTION 38 LAYOUT PHASE 1 SOUTH SHEET 1OF2
- 2466-104-2-G SECTION 38 LAYOUT PHASE 1 NORTH SHEET 2OF2
- 2466-106-1-D - LONGITUDINAL SECTIONS PHASE 1 SOUTH
- 2466-106-2-E - LONGITUDINAL SECTIONS - PHASE 1 SOUTH EAST
- 2466-106-3-E LONGITUDINAL SECTIONS PHASE 1 SOUTH WEST
- 2466-108- TYPICAL DRAINAGE CONSTRUCTION DETAILS - SECTION 104
- 2466-109-7-F MANHOLE SCHEDULES SW CATCHMENT C
- 2466-111-A-PRIVATE PERMEABLE PAVING SCHEDULES
- 2466-115-B SITE LOCATION PLAN S38
- 2466-116-GREENFIELD AREAS PLAN
- 2466-122-1-J SAB ADOPTION PLAN CATCHMENT C SHEET 1OF3
- 2466-122-2 K SAB ADOPTION PLAN - CATCHMENT C SHEET 2OF 3
- 2466-122-3-G SAB ADOPTION PLAN - CATCHMENT C SHEET 3OF3
- 2466-130-C SUDS CATCHMENT PLAN
- 2466-131- PRE-DEVELOPMENT RUN OFF PLAN
- 2466-133-J IMPERMEABLE AREAS PLAN
- 2466-136-B BASIN SECTIONS CATCHMENT C
- 2466-138-2-D BIORETENTION SCHEDULE - CATCHMENT C
- 2466-139-A PROPOSED EXCEEDANCE PLAN CATCHEMENT C
- 2466-140-6-E HYDROBRAKE CONSTRUCTION DETAILS SC15
- 2466-140-7-D-HYDROBRAKE CONSTRUCTION DETAIL SC40
- 12580 ABERDARE HOSPITAL POST DEMOLITION GEOENVIRONMENTAL SITE INVESTIGATION REPO
- 12580 ABERDARE HOSPITAL POST DEMOLITION GEOENVIRONMENTAL SITE INVESTIGATION REPO
- 20071-WDL-D011 B EXISTING AND PROPOSED IMPERMEABLE AREA PLAN
- 20071-WDL-TN001 THINK URBAN DRAINAGE STRATEGY
- 2466-100-1-R ENGINEERING LAYOUT PHASE 1 SHEET 1 OF 5
- 2466-100-S-N ENGINEERING LAYOUT PHASE 1 SHEET 2 OF 5
- 2466-100-3- P ENGINEERING LAYOUT PHASE 1 SHEET 3 OF 5
- 2466-100-4-P ENGINEERING LAYOUT - PHASE 1 SHEET 4OF5
- 2466-100-5-G ENGINEERING LAYOUT - PHASE 1 SHEET 5OF 5
- LLFA
- 2466-115-B SITE LOCATION PLAN
- 2466-145-B AQUAKERB CONSTRUCTION DETAILS
- 2466-100-5-F- ENGINEERING LAYOUT PHASE 1 SHEET 5OF5
- 2466-105-2-D SECTION 38 LAYOUT PHASE 2 NORTH SHEET 2OF2
- 2466-116-1-C SWEPT PATH ANALYSIS- REFUSE -NORTH REV C
- 2466-120-3-D SAB ADOPTION PLAN - CATCHMENT A SHEET 3 OF 5
- 2466-126-2-E SURFACING AND KERBING LAYOUT - PHASE 2 - NORTH- SHEET 2OF2
- 2466-146-A- BIORETENTION DIFFUSER CHAMBER DETAILS -A3L SIZE
- 2466-101-1-I ENGINEERING LAYOUT - PHASE 2 - SHEET 1 OF 4
- 2466-106-1-D- LONGITUTINAL SECTIONS - PHASE 1 - SOUTH
- 2466-116-2-C SWEPT PATH ANALYSIS - REFUSE - SOUTH REV C
- 2466-120-4-G-SAB ADOPTION PLAN
- 2466-127-1-E SURFACING AND KERBING LAYOUT - PHASE 1 SOUTH - SHEET 1OF 2
- 2466 HIGHWAY CONSTRUCTION DETAILS - FOTHERGILL PARK REV. A
- 2466-101-2-F ENGINEERING LAYOUT - PHASE 2 SHEET 2 OF 4
- 2466-106-2-E - LONGITUDINAL SECTIONS - PHASE 1 - SOUTH EAST
- 2466-117-0 CONTOUR PLAN- S38
- 2466-120-5-F-SAB ADOPTION PLAN CATCHMENT A SHEET 5OF5
- 2466-127-2-E SURFACING AND KERBING LAYOUT PHASE 1 - NORTH SHEET 2OF2
- S3-EST-154 ABERDARE HOSPITAL SITE - PHASE 1 S.38 (V5)
- 2466-101-3-D - ENGINEERING LAYOUT PHASE 2 - SHEET 3OF4
- 2466-106-E LONGITUDINAL SECTIONS - PHASE 1 - SOUTH WEST
- 2466-118-1-0- COMBINED SERVICES PLAN - SHEET 1
- 2466-121-C SAB ADOPTION PLAN CATCHMENT B
- 2466-128-B- SIGNING AND LINING DETAILS
- 2466-100-1-Q ENGINEERING LAYOUT - PHASE 1 SHEET 1OF5
- 2466-101-4-J- ENGINEERING LAYOUT - PHASE 2 SHEET 4OF4
- 2466-107-1-B LONGITUDINAL SECTIONS - PHASE 2 - NORTH 1 OF 3
- 2466-118-2-0- COMBINED SERVICES PLAN SHEET 2
- 2466-122-1-H- SAB ADOPTION PLAN- CATCHMENT C SHEET 1OF 3
- 2466-129-0 SIGNING AND LINING PLAN
- 2466-100-2-M ENGINEERING LAYOUT - PHASE 1 SHEET 2OF5
- 2466-104-14-E SECTION 38 LAYOUT - PHASE 1 SOUTH - SHEET 1OF2
- 2466-107-2-F LONGITUDINAL SECTIONS PHASE 2 - NORTH 2OF3
- 2466-118-3-0- COMBINED SERVICES PLAN SHEET 3
- 2466-122-2-I-SAB ADOPTION PLAN CATCHMENT C - SHEET 2OF3
- 2466-141-1-G BIORETENTION
- 2466-100-3-0- ENGINEERING LAYOUT- PHASE 1 - SHEET 3OF5
- 2466-104-2-E SECTION 38 LAYOUT PHASE 1 NORTH SHEET 2OF2
- 2466-107-3-D LONGITUDINAL SECTIONS PHASE 2 NORTH 3OF3
- 2466-120-1-D SAB ADOPTION PLAN - CATCHMENT A SHEET 1OF5
- 2466-122-3-E- SAB ADOPTION PLAN CATCHMENT C SHEET 3OF3
- 2466-143-1-B BASIN CONSTRUCTION DETAILS
- 2466-100-A-O ENGINEERING LAYOUT - PHASE 1 SHEET 4OF5
- 2466-105-1-E SECTION 38 LAYOUT PHASE 2 - SOUTH SHEET 1OF2
- 2466-108 TYPICAL DRAINAGE CONSTRUCTION DETAILS - SECTION 104
- 2466-120-2-G-SAB ADOPTION PLAN - CATCHMENT A - SHEET 2OF5
- 2466-126-1-E SURFACING AND KERBING LAYOUT PHASE 2 SOUTH- SHEET 1OF2
- S3-EST-154 - ABERDARE HOSPITAL SITE - PHASE 1 S.38 (V4)
- APP FORM
- COVERING LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Rhondda Cynon Taf for determination, against a statutory target of eight weeks. Over the last year Rhondda Cynon Taf decided condition discharge and variation applications in a median of 67 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Former Aberdare General Hospital Abernant Road Aber-nant Aberdare Rhondda Cynon Taf
99% historically approved · decision due ~26 Sep
Partial Discharge of Conditions 17 and 21 (Verification) of planning permission 22/0676/10
Awaiting decision Conditions 5 docs -
Former Aberdare General Hospital Abernant Road Aber-nant Aberdare Rhondda Cynon Taf
99% historically approved · decision due ~26 Sep
Discharge of Condition 16 and 20 (Contamination) and 22 (Long Term Monitoring) of planning permission 22/0676/10 (Additional Info Rec. 10/03/26)
Awaiting decision Conditions 17 docs -
Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF
99% historically approved · decision due ~6 Jun
Discharge of Condition 11 (Drainage) of planning permission 22/0676/10 (Additional Info Rec. 12/12/25)
Awaiting decision Conditions 25 docs -
Former Aberdare General Hospital Abernant Road Aber-Nant Aberdare CF44 0RF
Discharge of Conditions 5 Wildlife Protection Plan, 6 Habitat Management Plan, 23 Lichen, 24 Ecologically Sensitive Construction of SUDS, 27 Lower Plants, 28 Invertebrates, 29 Bat Mitigation, and 30 Species Protection Plan (22/0676/10)
Granted Conditions 5 docs -
Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF
Proposed non-material amendment application to vary Condition 2 (Approved Plans) of planning permission 22/0676/10
Granted Amendments 10 docs -
Former Aberdare Hospital Site Off Abernant Road Aberdare CF44 0RF
Discharge of Condition 8 (Levels) of planning permission 22/0676/10.
Granted Conditions 19 docs
Other condition discharge and variation applications
In Rhondda Cynon Taf
-
26/0772/DIS Awaiting decision
Land At 24 & 25 Pleasant View Pentre CF41 7JA
Discharge of Conditions 3 (Structural Calculations), 4 (Surface Water Drainage) and 5 (Vehicular Crossover) of planning permission 21/0846/FUL.
-
26/0088/DIS Granted
Clydach Vale Rhondda Cynon Taf Cbc Cambrian Court Business Pavilion Clydach Tonypandy CF40 2XX
Discharge of Condtion 14 (Boundary Treatment and Signage) of planning permission 24/1297/FUL.
-
25/0960/DIS Granted
47 Sion Street Pontypridd Rhondda Cynon Taf CF37 4SD
Discharge of conditions 3 (Materials), 8 (Vehicular Crossover), 10 (Foul Drainage Strategy), 11 (Broadbroad), 14 (Construction Management Plan), & 15 (Guardrail Details) of planning permission 24/0479/FUL.
-
26/0720/DIS Awaiting decision
Greenfield Off Pound Farm Lane Tonteg Pontypridd CF38 1SU
Dischrage of Condition 10 Declaration of safe and stable site of planning permission 24/1159/RVOC.
-
26/0228/DIS Granted
Riverside Farm Road Aberaman Aberdare CF44 6LJ
Discharge of Conditions 3 (Northeastern Boundary Treatments) and 7 (Biodiversity Enhancement Scheme) of Planning Permission Ref. 24/1005/FUL (Updated Biodiversity Strategy Rec. 15/07/26)