Planning application
Kingsgate 62 High Street Redhill Surrey RH1 1SG
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Alterations to existing glazed curtain walling and cladding to provide new level access door to ground floor office.
As published by the council, reference 26/01201/F
Application record
- Reference
- 26/01201/F
- Category
- Full applications
- Status
- Registered
- Validated
- 28 Jul 2026
- Postcode
- RH1 1SG
Timeline
Dates from the published record
-
28 Jul 2026
Validated
Checked as complete and ready for consideration.
-
5 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Reigate and Banstead took a median of 56 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Reigate and Banstead for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Berkeley House 51 High Street Redhill Surrey RH1 1RX
Submission of Construction Transport Management Plan details pursuant to condition 5 of permission 25/00104/PAP3MA. Change of use from offices (Use Class E) to residential (Use Class C3) to provide 18 self-contained flats under Schedule 2, Part 3, Class MA of the Town and Country Planning (General Permitted Development) (England) Order 2025 (as amended). As amended on 11/05/2026 and on 08/06/2026.
Granted Conditions New dwelling 17 docs -
Bridge Gate House 55 - 57 High Street Redhill Surrey RH1 1RX
Non Material Amendment. Reduction in overall width of enclosure by replacement of inner wall 200mm from previously identified position.
Granted Amendments 7 docs -
Red Central 60 High Street Redhill Surrey RH1 1SG
Advertisement consent: Installation and display of one internally illuminated fascia sign and one internally illuminated building number sign.
Granted Advertising 41 docs -
Red Central 60 High Street Redhill Surrey RH1 1SG
External alterations to front elevation at ground and upper levels; installation of amenity deck to front elevation at first floor; installation of rooftop plant and photovoltaic panels
Granted Full applications 42 docs -
Bridge Gate House 55 - 57 High Street Redhill Surrey RH1 1RX
Demolition and like-for-like replacement of existing electrical sub-station enclosure
Granted Full applications Demolition 16 docs -
1 Marketfield Road Redhill Surrey RH1 1RY
3 x building banners printed on supreme mesh material and applied to brickwork.
Granted Advertising 9 docs
Other full applications applications
In Reigate and Banstead
-
26/00866/F Awaiting decision
Recreation Ground Garratts Lane Banstead Surrey SM7 2EA
The creation of a permeable parking area in the Garton field.
-
26/01325/F Awaiting decision
Orchard Bungalow Beechen Lane Lower Kingswood Surrey KT20 6RY
Conversion of single residential dwelling house (bungalow) into two residential dwellings.
-
26/01399/F Awaiting decision
Flat 2 Whisperer Villa Yattendon Road Horley Surrey RH6 7BS
Loft Conversion.
-
26/01304/F Awaiting decision
Earlswood Scout Group HQ Earlswood Road Redhill Surrey RH1 6HE
Demolition of existing Scout Hall to provide a new purpose-built Scout Hall over 2 levels meeting accessibility requirements. Works include part demolition of extensions to the existing separate Art Matters hall and improvements to the main hall including accessible WC and access. External works include formalising existing parking and enhancing landscaping across the wider site.
-
26/00691/F Refused
BNP Care La Luz 4 High Street Tadworth Surrey KT20 5SD
Demolition of rear extensions, conservatory and partition walls at ground floor level. Construction of 2 single storey rear extensions and glass-roofed conservatory between. Construction of side extension at first floor level on southeast flank with new dormer window. Main roof extensions at rear and on southeast flank, each with new dormer windows. Alteration to fire escape staircase from first floor level. Installation of new lift serving all 3 floors. New rear terrace and ramp to garden. Soft landscaping to front parking area. As amended on 29/06/2026, 20/07/2026 and on 14/08/2026.