Skip to content
PlanIndex Get alerts
Menu

Planning application

Rear Of Egmont Park House Egmont Park Road Walton On The Hill Surrey KT20 7QG

Granted Reigate and Banstead 23/01347/F Full planning

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Provision of a detached dwelling to the rear of Egmont Park House and the provision of a replacement garage building and bin store adjacent to the existing property. As amended on 02/04/2024, 03/06/2024, 10/06/2024, 03/07/2024 and on 17/07/24.

As published by the council, reference 23/01347/F

Application record

Reference
23/01347/F
Type
Full planning
Status
Decided (Approved)
Decision
Approved with Conditions
Received
8 Aug 2023
Validated
8 Aug 2023
Decided
26 Jul 2024
Ward
Lower Kingswood Tadworth And Walton
Decision by
Principal Planning Officer
Postcode
KT20 7QG

Site history

Applications at this address on the Reigate and Banstead register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • 24/00108/TPO Granted

    Rear Of Egmont Park House Egmont Park Road Walton On The Hill Surrey KT20 7QG

    T1-T4: Beech, Actions: 2-3m lateral reductions (as highlighted in supporting photographs). Please note there is no height reduction. Reasons: Generally curtail trees into more compact appearance, and to allow more sunlight into rear garden of Egmont Park House at certain points during the day.

    Decided 14 Mar 2024 Trees

Timeline

Dates from the published record

  1. 8 Aug 2023

    Received by Reigate and Banstead

  2. 26 Jul 2024

    Decision issued: Approved with Conditions

  3. 30 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

52 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Reigate and Banstead granted permission on 26 July 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Reigate and Banstead

  • 26/01026/F Granted

    Kimberley Clark Europe Douglas House 40 London Road Reigate Surrey RH2 9QP

    Replacement of windows and further external alterations at lower ground floor only. As amended on 01/09/2026

    11 Sep 2026 Full applications
  • 26/01374/F Awaiting decision

    Seven Day Grocers 5 - 7 Meath Green Lane Horley Surrey RH6 8EE

    Siting of a InPost Parcel Locker.

    Full applications
  • 26/01476/F Awaiting decision

    Harlequin Theatre 16 London Road Redhill Surrey RH1 1NN

    Refurbishment and upgrading of Harlequin theatre including removal and replacement of roof covering, new MEP plant to the upper & lower roof, replacement of mansafe system with safety handrails, removal of penthouse to main roof, replacement of glazing over triangular stair bay window to dormer roof detail and associated works.

    Full applications
  • 26/01406/F Awaiting decision

    Georgian Court Church Street Reigate RH2 0AA

    Installation of two external access staircases and associated walkways to the rear of the building including new door openings to provide independent access to the existing residential accommodation.

    Full applications
  • 26/00826/F Granted

    Beecholme Recreation Ground Osier Way Banstead Surrey SM7 1LL

    Excavation for and creation of a level base for re-laying an artificial grass surface. As amended on 28/07/2026.

    9 Sep 2026 Full applications