Skip to content
PlanIndex Get alerts
Menu

Planning application

24-26 St Johns Road Redhill Surrey RH1 6HX

Granted Reigate and Banstead 22/02517/F Full planning

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from C2 to 2no. C3 dwellinghouses, with associated works including removal of disabled ramp and replacement with external stairs. As amended on 09/01/2023.

As published by the council, reference 22/02517/F

Application record

Reference
22/02517/F
Type
Full planning
Status
Decided (Approved)
Decision
Approved with Conditions
Received
16 Nov 2022
Validated
16 Nov 2022
Decided
27 Jan 2023
Ward
Earlswood And Whitebushes
Decision by
Head of Places and Planning
Postcode
RH1 6HX

Timeline

Dates from the published record

  1. 16 Nov 2022

    Received by Reigate and Banstead

  2. 27 Jan 2023

    Decision issued: Approved with Conditions

  3. 31 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 128 Earlsbrook Road Redhill Surrey RH1 6HZ

    21/01435/CLP Submitted 24 May 2021 89m away

    Rear single storey extension

    Granted Lawful development Extension 5 docs
    Small domestic
  • 111 Earlsbrook Road Redhill Surrey RH1 6HY

    23/00165/HHOLD Submitted 17 Mar 2023 92m away

    Proposed single storey rear extension, side entrance door and window. Together with roof conversion incorporating dormer extension and rooflights on the front elevation.

    Granted Householder Extension Loft or dormer +1 9 docs
    Small domestic
  • St Johns Court 51 St Johns Road Redhill Surrey RH1 6DS

    23/01414/DET14 Submitted 30 Sep 2024 110m away

    Submission of travel pack details pursuant to condition 14 of permission 23/01414/F. Alterations to fenestration and facade of the building to facilitate the prior approval application 19/02019/PAP30, including changes to site layout.

    Granted Conditions Windows or glazing 6 docs
  • St Johns Court 51 St Johns Road Redhill Surrey RH1 6DS

    23/01414/F Submitted 10 Jul 2023 110m away

    Alterations to fenestration and facade of the building to facilitate the prior approval application 19/02019/PAP30, including changes to site layout.

    Granted Full applications Windows or glazing 21 docs
  • St Johns Court 51 St Johns Road Redhill Surrey RH1 6DS

    23/01414/NMAMD1 Submitted 10 Oct 2024 110m away

    Amend the wording of condition 12. As amended on 01/11/2024 and on 06/11/24.

    Granted Amendments 6 docs
  • St Johns Court 51 St Johns Road Redhill Surrey RH1 6DS

    24/01570/F Submitted 6 Sep 2024 110m away

    Creation of a substation. As amended on 11/10/2024 and on 1/11/2024.

    Granted Full applications 15 docs

In Reigate and Banstead

  • 26/00866/F Awaiting decision

    Recreation Ground Garratts Lane Banstead Surrey SM7 2EA

    The creation of a permeable parking area in the Garton field.

    Full applications
  • 26/01325/F Awaiting decision

    Orchard Bungalow Beechen Lane Lower Kingswood Surrey KT20 6RY

    Conversion of single residential dwelling house (bungalow) into two residential dwellings.

    Full applications
  • 26/01399/F Awaiting decision

    Flat 2 Whisperer Villa Yattendon Road Horley Surrey RH6 7BS

    Loft Conversion.

    Full applications
  • 26/01304/F Awaiting decision

    Earlswood Scout Group HQ Earlswood Road Redhill Surrey RH1 6HE

    Demolition of existing Scout Hall to provide a new purpose-built Scout Hall over 2 levels meeting accessibility requirements. Works include part demolition of extensions to the existing separate Art Matters hall and improvements to the main hall including accessible WC and access. External works include formalising existing parking and enhancing landscaping across the wider site.

    Full applications
  • 26/00691/F Refused

    BNP Care La Luz 4 High Street Tadworth Surrey KT20 5SD

    Demolition of rear extensions, conservatory and partition walls at ground floor level. Construction of 2 single storey rear extensions and glass-roofed conservatory between. Construction of side extension at first floor level on southeast flank with new dormer window. Main roof extensions at rear and on southeast flank, each with new dormer windows. Alteration to fire escape staircase from first floor level. Installation of new lift serving all 3 floors. New rear terrace and ramp to garden. Soft landscaping to front parking area. As amended on 29/06/2026, 20/07/2026 and on 14/08/2026.

    8 May 2026 Full applications