Planning application

13 and 15, Coventry Road, Ilford

Refused Redbridge 2526/21 Full Planning Permission

Works: Extension Demolition

At appeal, which passes the decision to the national inspectorate. Anyone who commented before is normally able to comment again.

Proposal

Demolish existing rear extension. Two storey rear extension to existing mother and baby parenting assessment centre with residential use. (summary)

As published by the council, reference 2526/21

Application record

Reference
2526/21
Type
Full Planning Permission
Status
Appeal decided
Decision
Refuse Permission/Consent
Received
10 Jun 2021
Validated
30 Jun 2021
Decided
24 Aug 2021
Ward
Valentines
Decision by
Delegated C/Signed A. Van Overbeke
Postcode
IG1 4QR

Timeline

Dates from the published record

  1. 10 Jun 2021

    Received by Redbridge

  2. 30 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 24 Aug 2021

    Decision issued: Refuse Permission/Consent

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens at appeal

The process from here

This application is at appeal, which passes the decision from the council to the national planning inspectorate, or in Scotland usually to a local review body first. The appeal considers the scheme afresh against the same policies.

Anyone who commented on the original application is normally notified and can comment again within the appeal deadline. Appeal decisions take months rather than weeks, and the outcome replaces the council's decision.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Redbridge

  • 0092/26 Refused

    66, Kensington Drive, Woodford Green, IG8 8LW

    Change of use from a single dwelling house into a small HMO for up to 5 people. (Retrospective)(Summary).

    12 Jan 2026 Full applications
  • 3261/25 Granted

    Development At 64, Abbotsford Gardens, Woodford Green

    Erection of a single dwelling 3 bedroom house with basement, associated amenity space, car parking, cycle and refuse storage. (Summary)(Amended description)

    18 Nov 2025 Full applications
  • 1812/26 Granted

    32A, Tavistock Road, South Woodford, London

    Conversion of property from six flats into a single (one x 4-bedroom) dwelling house with associated amenity space, cycle and refuse storage. (Summary)

    6 Jul 2026 Full applications
  • 1308/26 Refused

    10, Jersey Road, Ilford, IG1 2HH

    Single storey rear extension. Change of use from a single dwelling house into a Children's Home for a maximum of two children aged between 5 and 17 years. (Summary).

    15 May 2026 Full applications
  • 1403/26 Refused

    663, CHIGWELL ROAD, WOODFORD GREEN, IG8 8AJ

    Single storey rear extension. Erection of a rear side boundary wall and sliding gate. (Summary).

    26 May 2026 Full applications