Planning application
HALL FARM, CHURCH LANE, ARBORFIELD, RG2 9HX (Loddon Garden Village)
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Hybrid planning application 252498 (part in full, part in outline) comprising outline application for: up to 2,800 residential units to include up to 100 custom and selfbuild plots; 2 primary schools (up to 3 forms of entry) to include early years provision and 1 secondary school (up to 12 forms of entry); one District Centre, to incorporate up to 11,000m2 of Class E (Commercial, Business and Service, to include a food store of around 2,500m2), and Class F (Local Community and Learning); one Local Centre, to incorporate up to 2,400m2 of Class E; a Sports Hub to include sports pitches and pavilion space; up to 4,250m2 of further Class E, Class F, and sui generis development to include commercial, health care and public house; associated green infrastructure, landscaping, public open space, play areas, and ecological enhancement measures; 20 gypsy and traveller pitches; drainage and flood alleviation measures to include Sustainable Urban Drainage Systems (SUDS) and engineering measures within Loddon Valley for the River Loddon; associated highway / transport / supporting infrastructure including spine road, pedestrian and cycle connections; associated utilities, infrastructure, and engineering works, including the undergrounding of overhead lines and an electricity substation; up to 0.5ha of land adjoining St Bartholomew’s Church for use as cemetery. All matters reserved other than access, incorporating: access to highways, incorporating: a new pedestrian, cycle and vehicular access to Lower Earley Way via a new 4th arm to the Meldreth Way roundabout; a new pedestrian, cycle and vehicular bridge over the M4; a new pedestrian, cycle and vehicular bridge over the River Loddon; a new vehicular access to the A327 Reading Road, via a new arm to the Observer Way roundabout; a new pedestrian, cycle and vehicular access to Thames Valley Science Park; Phase 1 of internal roads including pedestrian / cycle routes, associated infrastructure, drainage and landscaping.
As published by the council, reference PL/25/1570
Application record
- Reference
- PL/25/1570
- Type
- Adjacent Authority Consultation
- Status
- Decision Made
- Decision
- Object
- Received
- 3 Nov 2025
- Validated
- 3 Nov 2025
- Decided
- 11 Sep 2026
- Decision by
- Committee
- Postcode
- RG2 9HX
Timeline
Dates from the published record
-
3 Nov 2025
Received by Reading
-
27 Jul 2026
Added to PlanIndex
-
11 Sep 2026
Decision issued: Object
-
14 Sep 2026
Status changed to Decision Made
Previously Under Consultation.
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Reading has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land At Hall Farm Church Lane Arborfield Reading Wokingham RG2 9HX
61% historically approved · decision due ~29 Dec
Hybrid planning application for up to 2,800 residential units, 2 primary schools and 1 secondary school, new District Centre, new Local Centre and Sports Hub with ancillary development (Application Ref 252498) PLEASE NOTE THE DECISION ON THIS APPLICATION IS MADE BY WOKINGHAM BOROUGH COUNCIL
Awaiting decision Outline 1 doc -
Hall Farm Church Lane Arborfield Reading RG2 9HX
92% historically approved · decision due ~19 Dec
Hybrid planning application (part in full, part in outline) comprising outline application for: up to 2,800 residential units to include up to 100 custom and self-build plots; 2 primary schools (up to 3 forms of entry) to include early years provision and 1 secondary school (up to 12 forms of entry); one District Centre, to incorporate up to 11,000m2 of Class E (Commercial, Business and Service, to include a food store of around 2,500m2), and Class F (Local Community and Learning); one Local Centre, to incorporate up to 2,400m2 of Class E; a Sports Hub to include sports pitches and pavilion space; up to 4,250m2 of further Class E, Class F, and sui generis development to include commercial, health care and public house; associated green infrastructure, landscaping, public open space, play areas, and ecological enhancement measures; 20 gypsy and traveller pitches; drainage and flood alleviation measures to include Sustainable Urban Drainage Systems (SUDS) and engineering measures within Loddon Valley for the River Loddon; associated highway / transport / supporting infrastructure including spine road, pedestrian and cycle connections; associated utilities, infrastructure, and engineering works, including the undergrounding of overhead lines and an electricity substation; up to 0.5ha of land adjoining St Bartholomewâs Church for use as cemetery. All matters reserved other than access, incorporating: access to highways, incorporating: a new pedestrian, cycle and vehicular access to Lower Earley Way via a new 4th arm to the Meldreth Way roundabout; a new pedestrian, cycle and vehicular bridge over the M4; a new pedestrian, cycle and vehicular bridge over the River Loddon; a new vehicular access to the A327 Reading Road, via a new arm to the Observer Way roundabout; a new pedestrian, cycle and vehicular access to Thames Valley Science Park; Phase 1 of internal roads including pedestrian / cycle routes, associated infrastructure, drainage and landscaping. Application includes full permission for the delivery of proposed 40.4 hectares of Suitable Natural Greenspace (SANG), 18.35 hectares of SANG link, and provision of Biodiversity Net Gain measures, the demolition and clearance of buildings and structures at the Centre for Dairy Research (CEDAR) and at Hall Farm, the demolition of 3 existing dwellings, and the retention of specified buildings at Hall Farm as specified by the applications drawings.
Awaiting decision New dwelling Demolition 972 docs -
Centre For Dairy Research, Hall Farm Church Lane Arborfield Wokingham RG2 9HX
Application to vary condition 2 of planning consent 152726 for the construction of a new slurry tank and dry cow shed, to allow changes to improve drainage and ventilation, and the removal of condition 4 relating to archaeological work.
Granted Conditions 8 docsSmall domestic -
Hall Farm Church Lane Arborfield Reading RG2 9HX
Hybrid planning application (part in full, part in outline) comprising outline application for: up to 2,800 residential units to include up to 100 custom and selfbuild plots; 2 primary schools (up to 3 forms of entry) to include early years provision and 1 secondary school (up to 12 forms of entry); one District Centre, to incorporate up to 11,000m2 of Class E (Commercial, Business and Service, to include a food store of around 2,500m2), and Class F (Local Community and Learning); one Local Centre, to incorporate up to 2,400m2 of Class E; a Sports Hub to include sports pitches and pavilion space; up to 4,250m2 of further Class E, Class F, and sui generis development to include commercial, health care and public house; associated green infrastructure, landscaping, public open space, play areas, and ecological enhancement measures; 20 gypsy and traveller pitches; drainage and flood alleviation measures to include Sustainable Urban Drainage Systems (SUDS) and engineering measures within Loddon Valley for the River Loddon; associated highway / transport / supporting infrastructure including spine road, pedestrian and cycle connections; associated utilities, infrastructure, and engineering works, including the undergrounding of overhead lines and an electricity substation; up to 0.5ha of land adjoining St Bartholomews Church for use as cemetery. All matters reserved other than access, incorporating: access to highways, incorporating: a new pedestrian, cycle and vehicular access to Lower Earley Way via a new 4th arm to the Meldreth Way roundabout; a new pedestrian, cycle and vehicular bridge over the M4; a new pedestrian, cycle and vehicular bridge over the River Loddon; a new vehicular access to the A327 Reading Road, via a new arm to the Observer Way roundabout; a new pedestrian, cycle and vehicular access to Thames Valley Science Park; Phase 1 of internal roads including pedestrian / cycle routes, associated infrastructure, drainage and landscaping.
Decided Outline 3 docs -
Hall Farm Church Lane Arborfield RG2 9HX
Full application for the proposed construction of a single storey infill extension to an agricultural building and the relocation of a dung midden.
Granted Full applications Extension 15 docsSmall domestic -
Hall Farm, Centre For Dairy Research Church Lane Arborfield RG2 9HX
Application for prior notification of agricultural or forestry development - proposed roof between two buildings.
Granted Outline 8 docs
Other outline applications
In Reading
-
PL/25/1651 Decided
Land North of Mole Road and Church Lane, Newlands Farm, RG2 9JD
Outline planning application with all matters reserved other than principal access from Mole Road, for up to 430 dwellings, associated infrastructure to include a connection through to the proposed Spine Road, ref. 252498, new pedestrian cycle link connecting Byway ARB03 Carter’s Hill Lane and Byway ARB08 Ellis’s Hill, associated landscaping to include formal and informal public open space, biodiversity enhancements and associated utilities, infrastructure, and engineering works.
-
PL/26/1185 Awaiting decision
KIRTONS FARM ROAD, PINGEWOOD, RG30 3UH
Request for observations by Reading Borough Council on Wokingham Borough Council application (WBC Ref 262054) for the proposed removal of previously imported soils currently stored on part of the Site, including required enabling works and vegetation clearance, followed by the restoration and reprofiling of the land to its original level using only indigenous material placed elsewhere on the Site.
-
PL/26/0953 Decided
2 ROSEHILL FARM COTTAGES, PEPPARD ROAD, EMMER GREEN, READING, RG4 8XA
Demolition of existing stable and garage block. Erection of a new self-build dwelling
-
PL/25/1447 Refused
19 PARKSIDE ROAD, READING, RG30 2BT
The erection of four residential dwellings (phased) with associated hard and soft landscaping and parking with the construction of a new access from Parkside Road and Kearsley Road following demolition of outbuildings (outline application considering access all other matters reserved (appearance, landscaping, layout, scale))”
-
PL/26/0519 Awaiting decision
THAMES VALLEY POLICE, CASTLE STREET, READING, RG1 7TH
Request for EIA Screening Opinion