Skip to content
PlanIndex Get alerts
Menu

Planning application

Ibis Reading Centre 25a Friar Street Reading RG1 1DP

Granted Reading 210774 Full planning permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Recladding of the existing hotel to replace the Proteus 10 insulated metal rainscreen panel cladding and the insulated metal curtain wall panel with solid aluminium cladding.

As published by the council, reference 210774

Application record

Reference
210774
Type
Full planning permission
Status
Decision Made
Decision
Approve
Received
17 May 2021
Validated
1 Jun 2021
Decided
6 Sep 2021
Ward
Abbey Ward
Parish
Reading Borough
Decision by
Delegated Decision
Postcode
RG1 1DP

Timeline

Dates from the published record

  1. 17 May 2021

    Received by Reading

  2. 1 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 6 Sep 2021

    Decision issued: Approve

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Reading

  • PL/26/0883 Granted

    REGENTS GATE, 25-41 CROWN STREET, READING, RG1 2PQ

    External alterations to building including new rooflights, smoke shafts, windows and doors.

    3 Jul 2026 Full applications
  • PL/26/0135 Granted

    9 BATH ROAD, READING, RG1 6HH

    Erection of outbuilding for use associated with Kadampa Meditation Centre.

    2 Feb 2026 Full applications
  • PL/26/0863 Withdrawn

    2 CONISBORO WAY, CAVERSHAM, READING, RG4 7HT

    Demolition of existing dwelling house and construction of replacement dwelling house.

    30 Jun 2026 Full applications
  • PL/25/1794 Withdrawn

    Village Hotel Reading, Richfield Avenue, Reading RG18BD

    The development of 6 Electric Vehicle charging vehicle bays and associated works

    12 Dec 2025 Full applications
  • PL/26/1125 Awaiting decision

    5-6 FRIAR STREET, READING, RG1 1DB

    Change of use of basement and ground floors from bar/nightclub (Sui Generis) to off-licence/retail use (Class E(a)).

    21 Aug 2026 Full applications