Planning application
Methodist Chapel , Cemmaes, SY20 9PR
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of former chapel building to a new residential dwelling
As published by the council, reference P/26/0803/FUL
Application record
- Reference
- P/26/0803/FUL
- Type
- Full planning permission
- Status
- Under Consultation
- Received
- 10 Aug 2026
- Validated
- 24 Aug 2026
- Ward
- Glantwymyn
- Parish
- Glantwymyn
- Decision by
- Delegated Decision
- Postcode
- SY20 9PR
Timeline
Dates from the published record
-
10 Aug 2026
Received by Powys
-
24 Aug 2026
Validated
Checked as complete and ready for consideration.
-
29 Aug 2026
Added to PlanIndex
-
6 Sep 2026
Status changed to Under Consultation
Previously Valid.
-
Decision
Awaiting decision
Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Powys took a median of 66 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Powys for determination, against a statutory target of eight weeks. Over the last year Powys decided full applications in a median of 110 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bryncoegen Cemmaes Road Cemmaes Machynlleth Powys SY20 9PR
TREE: Application for works to a tree in a conservation area
Granted Trees -
Cemmaes Jubilee Hall Cemmaes Machynlleth Powys SY20 9PR
Erection of a rear extension & alterations
Granted Full applications Extension -
Penrhos Arms Hotel Cemmaes Machynlleth Powys SY209PR
Erection of an extension to outbuilding to form additional hotel accommodation (renewal of permission M2000 0289)
Granted Full applications Extension -
Small domestic
-
Bryncoegen Cemmaes Machynlleth Powys SY209PR
Erection of a rear two storey extension & alterations
Granted Full applications Extension -
PT Os 0814 Cemmaes Machynlleth Powys SY209PR
Erection of two dwellinghouses and formation of of vehicular access (including demolition of outbuilding)
Granted Full applications DemolitionSeveral homes
Other full applications
In Powys
-
25/1879/FUL Granted
Trewylan Ganol Llansantffraid-Ym-Mechain SY22 6TJ
Formation of a Slurry Lagoon and all associated works
-
P/26/0632/FUL Granted
TREWERN ISAF, LLANRHAEADR-YM-MOCHNANT, OSWESTRY, SY10 0DP
Erection of extension to slurry lagoon, including additional lagoon for parlour washings
-
P/26/0569/FUL Granted
THE DANCE CENTRE, ARLAIS ROAD, LLANDRINDOD WELLS, LD1 5HE
Installation of 10Kw in-roof PV array on west elevation
-
P/26/0596/FUL Granted
0, Y groesffordd, Crossroads, Meifod, SY22 6YF
Erection of agricultural shed, including PV solar array (part retrospective)
-
P/26/0669/FUL Granted
62-64 COMMERCIAL STREET, YSTRADGYNLAIS, SWANSEA, SA9 1LA
Change of use of dwelling to A1 retail unit and single flat. Reinstatement of shop front and signage. Remove existing conservatory on rear elevation and install patio doors. Construction of external access stairway.