Planning application
Methodist Chapel , Cemmaes, SY20 9PR
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of former chapel building to a new residential dwelling
As published by the council, reference P/26/0803/FUL
Application record
- Reference
- P/26/0803/FUL
- Type
- Full planning permission
- Status
- Under Consultation
- Received
- 10 Aug 2026
- Validated
- 24 Aug 2026
- Ward
- Glantwymyn
- Parish
- Glantwymyn
- Decision by
- Delegated Decision
- Postcode
- SY20 9PR
Timeline
Dates from the published record
-
10 Aug 2026
Received by Powys
-
24 Aug 2026
Validated
Checked as complete and ready for consideration.
-
29 Aug 2026
Added to PlanIndex
-
6 Sep 2026
Status changed to Under Consultation
Previously Valid.
-
Decision
Awaiting decision
Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Powys took a median of 62 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Powys for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Bryncoegen Cemmaes Road Cemmaes Machynlleth Powys SY20 9PR
TREE: Application for works to a tree in a conservation area
Granted Trees -
Penrhos Arms Hotel Cemmaes Machynlleth Powys SY209PR
Erection of an extension to outbuilding to form additional hotel accommodation (renewal of permission M2000 0289)
Granted Full applications Extension -
Small domestic
-
Bryncoegen Cemmaes Machynlleth Powys SY209PR
Erection of a rear two storey extension & alterations
Granted Full applications Extension -
Llys-Teg / Brynffynnon Cemmaes Machynlleth Powys SY20 9PR
Erection of 2 single garages together with the construction of a retaining wall
Granted Full applications -
Ger Maes Y Llan Cemmaes Machynlleth Powys
Erection of 4 no. dwellings and 2 no. bungalows and construction of a new vehicular access road
Granted Full applications 1 docSeveral homes
Other full applications applications
In Powys
-
25/1761/FUL Granted
Ty Capel, Pennant, Llanbrynmair, SY19 7BL
Change of use of land to domestic curtilage, erection of an ancillary storage building and access track
-
P/26/0063/FUL Granted
PARC YR ESGOB, LLANWNOG, CAERSWS, SY17 5NY
Erection of a dry manure storage building and associated works
-
P/26/0416/FUL Granted
THE WAEN FARM, FELINDRE, KNIGHTON, LD7 1YT
Extension to an existing agricultural building
-
P/26/0275/FUL Granted
YSTRADGNLAIS RUGBY FOOTBALL CLUB, YNYSCEDWYN ROAD, YSTRADGYNLAIS, SWANSEA, SA9 1BH
Installation of 1 no. EV charger and feeder pillar
-
P/26/0893/FUL Awaiting decision
LLWYNMADOC FARM, ABERMULE, MONTGOMERY, SY15 6JW
Erection of manure storage building