Planning application
102 Fratton Road Portsmouth PO1 5BZ
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Outline application for construction of additional storey to form 1no. self-contained flat and associated alterations with access, appearance, landscaping, layout and scale to be considered at this stage
As published by the council, reference 25/01520/OUT
Application record
- Reference
- 25/01520/OUT
- Type
- Outline Application
- Status
- Withdrawn
- Decision
- Application Withdrawn
- Received
- 24 Dec 2025
- Validated
- 21 Jan 2026
- Decided
- 25 Feb 2026
- Ward
- Fratton
- Decision by
- Delegated
- Postcode
- PO1 5BZ
Timeline
Dates from the published record
-
24 Dec 2025
Received by Portsmouth
-
21 Jan 2026
Validated
Checked as complete and ready for consideration.
-
25 Feb 2026
Decision issued: Application Withdrawn
-
25 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
SMR Architect Agent, an architecture practice
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Portsmouth decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
86 - 88 Fratton Road Portsmouth
Replacement of the shopfront and installation of kitchen extraction system
Granted Full applications Windows or glazing 39 docs -
Cornwall Mews 31a Cornwall Road Portsmouth
Construction of additional storey to an existing residential building to create 2 no. one-bedroom flats with associated external alterations.
Refused Full applications New dwelling 13 docs -
38 Claremont Road Portsmouth PO1 5BN
Change of use from house in multiple occupation (Class C4), to purposes falling within dwellinghouse (Class C3), or house in multiple occupation (Class C4)
Granted Full applications 5 docsDomestic -
20 Fratton Road Portsmouth PO1 5BX
74% historically approved · decision due ~12 Jun
Application for prior approval (Schedule 2, Part 3, Class MA) for change of use of from Class E to 1 no. flat on first floor
Awaiting decision Prior approvalDomestic -
Progressive Spiritualist Church 2 Vivash Road Portsmouth PO1 1PR
83% historically approved · decision due ~11 May
Conversion of spiritualist church building to 2no. self-contained flats and associated alterations
Awaiting decision Full applications New dwelling 10 docs -
164 - 168 Fratton Road Portsmouth PO1 5HD
Retrospective application for display of 2no. internally illuminated ATM fascia signs
Granted Advertising 7 docs
Other outline applications
In Portsmouth
-
26/00225/CONS Awaiting decision
Guildhall Guildhall Square Portsmouth PO1 2AB
Pre-Submission Portsmouth Local Plan 2024 Standard Tipner representations. Between 9 July 2024 to 3 September 2024, Portsmouth City Council consulted on the Pre-Submission (Regulation 19) Portsmouth Local Plan (PLP). These are the representations that were received by the Council on the draft Strategic Site Policy PLP3: Tipner West and Horsea Island East. They were written using a standard template by the Hampshire & Isle of Wight Wildlife Trust (HIWWT) and the Royal Society for the Protection for Birds (RSPB) as part of their "Dont Cross the Line" campaign for Tipner West. Each representor has been assigned a unique representor ID number. To search for a specific named representor, use the "Filter By: description" search option and enter the representor name in the "Description text" box. Please note that all other representations received on the Local Plan in 2024 can be accessed under "Pre-Submission PLP 2024 Non-standard representations" (26/00224/CONS). All representations that were made on the Pre-Submission PLP Addendum 2025 can be accessed under "All representations 2025" (26/00226/CONS). If you submitted both a standard Tipner representation and a non-standard representation as part of the PLP 2024 consultation, you will need to look in both "26/00224/CONS" and "26/00225/CONS".
-
26/00226/CONS Awaiting decision
Guildhall Guildhall Square Portsmouth PO1 2AB
Pre-Submission Portsmouth Local Plan Addendum 2025 All representations. Between 18 November 2025 to 8 January 2026, Portsmouth City Council consulted on the Pre-Submission (Regulation 19) Portsmouth Local Plan (PLP) Addendum. These are the representations that were received by the Council on all policies in the Pre-Submission PLP Addendum 2025 and/or its supporting evidence base. Each representor has been assigned a unique representor ID number. Where a single representor has sent in representations on multiple policies, this is identified in the filename. Representations on the Addendum include the letter "A" at the end of the file name. To search for a specific named representor, use the "Filter By: description" search option and enter the representor name in the "Description text" box. Please note that all other representations that were made on the PLP as part of the 2024 consultation can be accessed under either "Pre-Submission PLP 2024 Standard Tipner representations" (26/00225/CONS) or "Pre-Submission PLP 2024 Non-standard representations" (26/00224/CONS).
-
26/00224/CONS Awaiting decision
Guildhall Guildhall Square Portsmouth PO1 2AB
Pre-Submission Portsmouth Local Plan 2024 Non-standard representations . Between 9 July 2024 to 3 September 2024, Portsmouth City Council consulted on the Pre-Submission (Regulation 19) Portsmouth Local Plan (PLP). These are the representations that were received by the Council on all policies in the Pre-Submission PLP and/or its supporting evidence base. Each representor has been assigned a unique representor ID number. Where a single representor has sent in representations on multiple policies, this is identified in the filename. To search for a specific named representor, use the "Filter By: description" search option and enter the representor name in the "Description text" box. Please note that all the representations that were made on the Local Plan using the template from the Hampshire & Isle of Wight Wildlife Trust (HIWWT) and the Royal Society for the Protection for Birds (RSPB) as part of their "Dont Cross the Line" campaign for Tipner West can be accessed under Standard Tipner representations (26/00225/CONS). All representations that were made on the Pre-Submission PLP Addendum can be accessed under "All representations 2025" (26/00226/CONS).If you submitted both a standard Tipner representation and a non-standard representation as part of the PLP 2024 consultation, you will need to look in both "26/00224/CONS" and "26/00225/CONS".
-
25/00891/OUT Refused
140 Southampton Road Portsmouth
Outline application for proposed construction of 9no. dwellings (principles of layout and scale to be considered)
-
25/00004/EIASCR Decided
Former Debenhams Site And Car Park 134 - 142 Commercial Road Portsmouth PO1 1ET
Request for screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended 2018) for redevelopment of site to include demolition of existing former retail store (Class E) and the construction of 3 replacement buildings of 16 20 and 29 storeys in height accommodating retail space (Class E(a) - 975sqm), community and amenity space (1805sqm), and 724 residential units comprising apartments (183 x 1-bedroom; 181 x 2-bedroom; and 2 x 3-bedroom), and 358 co-living units, landscaped amenity areas, with access, layout and scale only to be considered at this stage (appearance and landscaping to be reserved matters)