Planning application
51 Emma Place Plymouth PL1 3QU
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of EV charger to facilitate pavement channel charging
As published by the council, reference 26/01197/FUL
Application record
- Reference
- 26/01197/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 26 Aug 2026
- Validated
- 28 Aug 2026
- Ward
- ST PETER AND THE WATERFRONT
- Postcode
- PL1 3QU
Timeline
Dates from the published record
-
26 Aug 2026
Received by Plymouth
-
28 Aug 2026
Validated
Checked as complete and ready for consideration.
-
1 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Plymouth took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Plymouth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
53 Emma Place Plymouth PL1 3QU
100% historically approved · decision due ~19 Aug
Replacement rear access bridge and door
Decided Heritage and listed buildings 16 docs -
53 Emma Place Plymouth PL1 3QU
100% historically approved · decision due ~16 Sep
Additional low profile rear skylight
Awaiting decision Heritage and listed buildings 11 docs -
53 Emma Place Plymouth PL1 3QU
Installation of EV charger to front exterior wall to facilitate pavement channel charging
Granted Heritage and listed buildings 15 docs -
-
53 Emma Place Plymouth PL1 3QU
93% historically approved · decision due ~6 Jan
Installation of EV charger to facilitate pavement channel charging
Awaiting decision Full applications 11 docs -
53 Emma Place Plymouth PL1 3QU
Proposed rear rooflight
Granted Heritage and listed buildings Loft or dormer 14 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01189/FUL Awaiting decision
25 Rockingham Road Plymouth PL3 5BW
Extension over existing attached garage with associated roof works, single storey rear extension and front porch