Planning application

Land At Shaw Way Plymouth PL9 9XH

Awaiting decision Plymouth 26/01105/FUL Full applications

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Removal of existing building and construction of replacement two-storey marine workshop and various associated external works (part retrospective)

As published by the council, reference 26/01105/FUL

Application record

Reference
26/01105/FUL
Category
Full applications
Status
Awaiting decision
Received
6 Aug 2026
Validated
11 Aug 2026
Ward
PLYMSTOCK RADFORD
Postcode
PL9 9XH

Timeline

Dates from the published record

  1. 6 Aug 2026

    Received by Plymouth

  2. 11 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Plymouth took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Plymouth

72 applications on PlanIndex · across 3 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

34 documents on file for this application

  • NATURAL ENGLAND Consultee Comment · 02 Sep 2026
  • NATURAL INFRASTRUCTURE Consultee Comment · 01 Sep 2026
  • LEAD LOCAL FLOOD AUTHORITY Consultee Comment · 01 Sep 2026
  • HIGHWAY AUTHORITY Consultee Comment · 25 Aug 2026
  • ENVIRONMENT AGENCY Consultee Comment · 13 Aug 2026
  • PHASE 1 CONTAMINATION REPORT PART 2 Supporting Information · 11 Aug 2026
  • PHASE 1 CONTAMINATION REPORT PART 3 Supporting Information · 11 Aug 2026
  • PHASE 1 CONTAMINATION REPORT PART 1 Supporting Information · 11 Aug 2026
  • OPEN SPACE ASSESSMENT & PLANNING JUSTIFICATION STATEMENT Supporting Information · 11 Aug 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Supporting Information · 11 Aug 2026
  • EXISTING SITE LOCATION PLAN Drawings and Images · 11 Aug 2026
  • SITE NOTICE GENERAL Decision Outcome · 11 Aug 2026
  • APPLICATION FORM Application · 06 Aug 2026
  • EXISTING SITE LAYOUT PLAN Drawings and Images · 06 Aug 2026
  • EXISTING FLOOR PLANS Drawings and Images · 06 Aug 2026
  • PROPOSED FLOOR PLANS Drawings and Images · 06 Aug 2026
  • COMBINED CONSTRUCTION AND MARINE ENVIRONMENT MANAGEMENT PLAN Supporting Information · 06 Aug 2026
  • DRAINAGE STATEMENT Supporting Information · 06 Aug 2026
  • HIGHWAY DILAPIDATION - APPENDIX A Supporting Information · 06 Aug 2026
  • HIGHWAY DILAPIDATION - APPENDIX B Supporting Information · 06 Aug 2026
  • HIGHWAY DILAPIDATION SURVEY REPORT Supporting Information · 06 Aug 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Supporting Information · 06 Aug 2026
  • STATEMENT OF RESOURCE MINIMSATION, CLIMATE RESILIENCE AND ENERGY STATEMENT Supporting Information · 06 Aug 2026
  • CTMP Supporting Information · 06 Aug 2026
  • ARBORICULTURAL IMPACT ASSESSMENT Supporting Information · 06 Aug 2026
  • PROPOSED SITE LAYOUT PLAN Drawings and Images · 06 Aug 2026
  • CIL FORM Application · 06 Aug 2026
  • EXISTING ELEVATIONS Drawings and Images · 06 Aug 2026
  • PROPOSED ELEVATIONS Drawings and Images · 06 Aug 2026
  • PROPOSED CGIS Drawings and Images · 06 Aug 2026
  • DRAWING ISSUE REGISTER Supporting Information · 06 Aug 2026
  • DESIGN AND ACCESS STATEMENT Supporting Information · 06 Aug 2026
  • EXISTING DRAINAGE PLAN Drawings and Images · 06 Aug 2026
  • PROPOSED DRAINAGE PLAN Drawings and Images · 06 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Plymouth for determination, against a statutory target of eight weeks. Over the last year Plymouth decided full applications in a median of 64 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 58 Shaw Way Plymouth PL9 9XH

    19/00211/PRDE Submitted 14 Feb 2019 66m away

    Single storey rear extension to property with a parapet wall

    Decided Outline Extension 10 docs
    Small domestic
  • 58 Shaw Way Plymouth PL9 9XH

    19/00116/PRDE Submitted 28 Jan 2019 66m away

    Single storey rear extension to property with a parapet wall 20cm height

    Refused Outline Extension 8 docs
    Small domestic
  • 58 Shaw Way Plymouth PL9 9XH

    19/01767/FUL Submitted 5 Nov 2019 66m away

    Erection of rear balcony and dormer and insertion of window on side elevation

    Refused Full applications Loft or dormer Windows or glazing 34 docs
  • 58 Shaw Way Plymouth PL9 9XH

    18/01262/PRDE Submitted 19 Jul 2018 66m away

    Loft conversion with dormer

    Decided Outline Loft or dormer 6 docs
  • 58 Shaw Way Plymouth PL9 9XH

    18/01578/PRDE Submitted 10 Sep 2018 68m away

    Single storey rear extension

    Refused Outline Extension 14 docs
    Small domestic
  • 6 Catalina Villas Plymouth PL9 9XQ

    18/02077/FUL Submitted 12 Dec 2018 157m away

    Single storey rear extension

    Granted Full applications Extension 12 docs
    Small domestic

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01214/FUL Awaiting decision

    10 Clifton Place Plymouth PL4 8HX

    Change of use from a dwellinghouse (Class C3) to a residential Institution (Class C2)

    31 Aug 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications