Planning application
West Hoe Pier West Hoe Road Plymouth PL1 3DE
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Structural repairs to and reinstatement of pier and steps following storm damage
As published by the council, reference 26/00739/LBC
Application record
- Reference
- 26/00739/LBC
- Category
- Heritage and listed buildings
- Status
- Awaiting decision
- Received
- 27 May 2026
- Validated
- 27 May 2026
- Ward
- ST PETER AND THE WATERFRONT
- Postcode
- PL1 3DE
Timeline
Dates from the published record
-
27 May 2026
Received by Plymouth
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Plymouth took a median of 54 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Plymouth City Council Agent and applicant
125 applications on PlanIndex · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
- EXTENSION OF TIME
- HISTORIC ENVIRONMENT OFFICER - FURTHER COMMENTS
- HISTORIC ENGLAND
- HISTORIC ENVIRONMENT OFFICER
- HERITAGE STATEMENT AND REASON FOR THE WORKS
- PHASE 2 NE ARM STABILISATION WORKS AS PROPOSED
- ISOMETRIC VIEW OF PIER HEAD REINSTATEMENT WORKS FOLLOWING STORM BRAM DAMAGE. DRA
- NORTH EAST PIER ARM PLAN AS PROPOSED INDICATING SLAB & CROSS WALL ARRANGEMENTS
- NATURAL INFRASTRUCTURE TEAM
- MR CHRIS MURPHY
- SITE NOTICE LISTED BUILDINGS
- APPLICATION FORM
- HERITAGE STATEMENT AND REASON FOR THE WORKS
- WEST HOE HARBOUR ACCESS STEP REMEDIAL WORKS SHEET 2 OF 2
- TYPICAL ELEVATIONS OF WEST HOE PIER AS EXISTING SHEET 3 OF 3
- TYPICAL ELEVATIONS OF WEST HOE PIER AS EXISTING SHEET 2 OF 3
- WEST HOE HARBOUR ACCESS STEP REMEDIAL WORKS SHEET 1 OF 3
- WEST HOE HARBOUR ACCESS STEP REMEDIAL WORKS SHEET 2 OF 3
- WEST HOE HARBOUR ACCESS STEP REMEDIAL WORKS SHEET 3 OF 3
- LOCATION PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Plymouth for determination, against a statutory target of eight weeks. Over the last year Plymouth decided heritage and listed building applications in a median of 66 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Rivage Apartments, Hoe Road Plymouth PL1 3DE
94% historically approved · decision due ~17 Sep
Condition Discharge: Condition 3 (External Materials) of application 25/01639/FUL
Decided -
-
Former Tennis Courts Hoe Road/Pier Street Plymouth
Variation of Condition 1 (Plans Condition) of application 14/01449/FUL
Granted Amendments 41 docs -
Former Tennis Courts Hoe Road/Pier Street Plymouth
Condition Discharge: Conditions 2 & 3 of application 18/01971/S73
Granted Conditions 18 docs -
Rivage Apartments, Hoe Road Plymouth PL1 3DE
Removal and replacement of existing combustible cladding and external wall elements with new non-combustible and associated works.
Granted Full applications 47 docs -
Commercial Unit To Rivage Apartments Hoe Road Plymouth PL1 3DE
Coffee shop signage.
Granted Advertising 5 docs
Other heritage and listed building applications
In Plymouth
-
26/01277/LBC Awaiting decision
6 Penlee Gardens Plymouth PL3 4AN
4no. wooden double glazed sash windows replacing existing uPVC.
-
26/01013/LBC Granted
3 Osborne Place Lockyer Street Plymouth PL1 2PU
Investigation and repair of water ingress affecting the front entrance, including lifting and reinstatement of paving, installation of waterproofing measures, repair works to the structure below and replacement of the entrance step finish with mosaic tiling.
-
26/01014/LBC Granted
53 Emma Place Plymouth PL1 3QU
Additional low profile rear skylight
-
26/00875/LBC Decided
53 Emma Place Plymouth PL1 3QU
Replacement rear access bridge and door
-
26/01198/LBC Awaiting decision
1 Berkeley Cottages Collingwood Road Plymouth PL1 5QT
Replacement roof covering (part retrospective) and associated works