Planning application
177 - 183 Grenville Road Plymouth PL4 9QD
Works: New dwelling
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of 8no self-contained apartments for elderly independent living with associated ancillary accommodation
As published by the council, reference 26/00693/FUL
Application record
- Reference
- 26/00693/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 19 May 2026
- Validated
- 19 May 2026
- Ward
- SUTTON AND MOUNT GOULD
- Postcode
- PL4 9QD
Site history
Applications at this address on the Plymouth register
This site has had 2 applications since 2025.
-
25/01106/CDM Awaiting decision
177 - 183 Grenville Road Plymouth PL4 9QD
Condition Discharge: Condition 16 (Reporting of Unexpected Contamination) of application 21/02227/FUL
Timeline
Dates from the published record
-
19 May 2026
Received by Plymouth
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Plymouth took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Design Development Ltd Agent, a design practice registered in Plymouth
Active · incorporated 2003 · Plymouth
81 applications on PlanIndex · across 4 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
55 documents on file for this application
- LANDSCAPE AND ECOLOGICAL MANAGEMENT PLAN
- EXTERNAL MATERIALS
- GENERAL SURFACING LAYOUT
- HIGHWAY AUTHORITY
- INFRASTRUCTURE SURVEY
- NOISE IMPACT ASSESSMENT.
- NATURAL INFRASTRUCTURE
- LEAD LOCAL FLOOD AUTHORITY
- GENERAL DRAINAGE LAYOUT PLANNING
- DEVELOPMENT MAP
- CONSTRUCTION SITE TRAFFIC MANAGEMENT PLAN
- CEMP
- ECOLOGICAL IMPACT ASSESSMENT
- BIODIVERSITY GAIN PLAN
- BIODIVERSITY NET GAIN STRATEGY
- 1 CONDITION ASSESSMENTS
- STATUTORY METRIC MACRO
- NOISE IMPACT ASSESSMENT
- DESIGN AND ACCESS STATEMENT
- PROPOSED ELEVATIONS
- PROPOSED SOFT WORKS PLAN
- PROPOSED DRAINAGE LAYOUT
- CALCULATIONS
- ENVIRONMENTAL HEALTH & LICENSING
- DESIGN AND ACCESS STATEMENT
- LOW CARBON
- CONSTRUCTION SITE TRAFFIC MANAGEMENT PLAN
- AMENDMENTS TO TENDER DOCUMENTS
- BRADGATE MEDIUM GREY DATA SHEET
- BRADGATE HARVEST ANTIQUE DATA SHEET
- PHOTO
- PROPOSED SITE PLAN, GF, 1ST AND ROOF PLANS
- CIVIL PROTECTION
- LEAD LOCAL FLOOD AUTHORITY
- NATURAL INFRASTRUCTURE
- ENVIRONMENTAL HEALTH & LICENSING.
- SOUTH WEST WATER
- (SUPERSEDED) PROPOSED ELEVATIONS
- SITE NOTICE GENERAL
- SITE SURVEY
- HEALTH & SAFETY EXECUTIVE
- APPLICATION FORM
- LOCATION PLAN
- DESIGN AND ACCESS STATEMENT
- SUPERSEDED PROPOSED SITE PLAN, GF, 1ST AND ROOF PLANS
- CIL FORM
- (SUPERSEDED) PROPOSED SOFT WORKS PLAN
- LANDSCAPE STRATEGY
- ECOLOGICAL IMPACT ASSESSMENT
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- CLIMATE EMERGENCY COMPLIANCE FORM
- THE STATUTORY METRIC
- GEO-ENVIRONMENTAL DESK STUDY PART 1
- GEO-ENVIRONMENTAL DESK STUDY PART 2
- GEO-ENVIRONMENTAL DESK STUDY PART 3
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Plymouth for determination, against a statutory target of eight weeks. Over the last year Plymouth decided full applications in a median of 63 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
177 - 183 Grenville Road Plymouth PL4 9QD
94% historically approved · decision due ~23 Oct
Condition Discharge: Condition 16 (Reporting of Unexpected Contamination) of application 21/02227/FUL
Awaiting decision Conditions 3 docs -
26 Junction Gardens Plymouth PL4 9AS
Pre-application for loft conversion and external alterations including timber staircase and associated screening
Decided Householder Loft or dormer 5 docsDomestic -
10 Junction Gardens Plymouth PL4 9AS
Single storey extension
Granted Full applications Extension 9 docsSmall domestic -
10 Junction Gardens Plymouth PL4 9AS
Installation of EV charger to facilitate pavement channel charging
Decided Full applications 8 docs -
-
110 Junction Gardens Plymouth PL4 9AS
Pre-application for a rear extension
Decided Householder Extension 4 docsDomestic
Other full applications
In Plymouth
-
26/01330/FUL Granted
54 Glendower Road Plymouth PL3 4LD
Installation of EV charger to facilitate pavement channel charging
-
26/00965/FUL Granted
11 Radnor Place Plymouth PL4 8DW
Conversion of house into two flats (2no C3)
-
26/00720/FUL Granted
Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG
Roof and wall replacement to Building S154 (part retrospective)
-
26/00865/FUL Granted
1 Siding Road Plymouth PL4 6AF
Removal and replacement of timber cladding with cement render across front elevation and gable ends of building
-
26/01511/FUL Awaiting decision
15 Pomphlett Road Plymouth PL9 7BH
Proposed secondary means of escape from roof