Skip to content
PlanIndex Get alerts
Menu

Planning application

119 Underlane Plymstock Plymouth PL9 9LB

Granted Plymouth 20/00707/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Side garage and rear porch

As published by the council, reference 20/00707/FUL

Application record

Reference
20/00707/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
19 May 2020
Validated
11 Jun 2020
Decided
6 Aug 2020
Ward
PLYMSTOCK RADFORD
Decision by
Delegated Decision
Postcode
PL9 9LB

Timeline

Dates from the published record

  1. 19 May 2020

    Received by Plymouth

  2. 11 Jun 2020

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2020

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 125 Underlane Plymstock Plymouth PL9 9LD

    26/00795/FUL Submitted 4 Jun 2026 80m away

    93% historically approved · decision due ~25 Aug

    Single storey side/rear extension and new pitched roof to existing front/side extension

    Awaiting decision Full applications Extension
    Small domestic
  • 12 Staddon Green Plymouth PL9 9LH

    20/00776/HHR Submitted 4 Jun 2020 97m away

    Pre-application for a detached annex above an existing garage

    Decided Householder 11 docs
    Domestic
  • 64 Mount Batten Way Plymouth PL9 9EB

    26/00400/FUL Submitted 18 Mar 2026 161m away

    Single storey rear extension

    Granted Full applications Extension 16 docs
    Small domestic
  • 28 Lippell Drive Plymouth PL9 9EL

    19/00800/HHR Submitted 16 May 2019 174m away

    Pre-application for raised decking (retrospective)

    Decided Householder 5 docs
    Domestic
  • 17 White Lady Road Plymouth PL9 9GA

    19/01752/FUL Submitted 31 Oct 2019 187m away

    Side and rear extension

    Granted Full applications Extension 11 docs
  • 84 Radford Park Road Plymouth PL9 9DX

    21/00557/MOR Submitted 24 Mar 2021 209m away

    Pre-application for take-away cafe from rear outbuilding

    Decided Outline 3 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications