Planning application
64 Mount Batten Way Plymouth PL9 9EB
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension
As published by the council, reference 26/00400/FUL
Application record
- Reference
- 26/00400/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Grant Conditionally
- Received
- 18 Mar 2026
- Validated
- 23 Mar 2026
- Decided
- 7 May 2026
- Ward
- PLYMSTOCK RADFORD
- Decision by
- Delegated Decision
- Postcode
- PL9 9EB
Timeline
Dates from the published record
-
18 Mar 2026
Received by Plymouth
-
23 Mar 2026
Validated
Checked as complete and ready for consideration.
-
7 May 2026
Decision issued: Grant Conditionally
-
26 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Hive Design Studio Ltd Agent, a design practice
28 applications on PlanIndex · across 2 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordRix Applicant, registered in Salford
Dissolved · incorporated 2009 · Salford
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
- FULL GRANT DECISION NOTICE
- OFFICER REPORT
- SOUTH WEST WATER
- SITE NOTICE GENERAL
- APPLICATION FORM
- BUILDING ELEVATIONS (PROPOSED)
- SITE LOCATION PLAN
- SITE LAYOUT PLAN (EXISTING)
- GA AND ROOF PLANS (EXISTING)
- BUILDING ELEVATIONS (EXISTING)
- GA PLANS AND ELEVATIONS (PROPOSED)
- SITE LAYOUT PLAN (PROPOSED)
- CIL FORM
- CLIMATE EMERGENCY COMPLIANCE FORM
- WILDLIFE TRIGGER TABLE
- ECOLOGICAL ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Plymouth granted permission on 7 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
62 Mount Batten Way Plymouth PL9 9EB
92% historically approved · decision due ~22 Dec
Extension to garage to form workshop (retrospective)
Awaiting decision Full applications Extension 7 docs -
28 Lippell Drive Plymouth PL9 9EL
Pre-application for raised decking (retrospective)
Decided Householder 5 docsDomestic -
6 Mount Batten Close Plymouth PL9 9EE
Rear/side raised decking (retrospective)
Granted Full applications 15 docs -
12 Staddon Green Plymouth PL9 9LH
Pre-application for a detached annex above an existing garage
Decided Householder 11 docsDomestic -
12 Staddon Green Plymouth PL9 9LH
Garage side extension (re-submission of 21/00319/FUL)
Granted Full applications Extension 22 docs -
91 Radford Park Road Plymouth PL9 9DS
Roof alterations including side dormers and rear glazing
Granted Full applications Loft or dormer Roofing +1 14 docs
Other full applications
In Plymouth
-
26/01330/FUL Granted
54 Glendower Road Plymouth PL3 4LD
Installation of EV charger to facilitate pavement channel charging
-
26/00965/FUL Granted
11 Radnor Place Plymouth PL4 8DW
Conversion of house into two flats (2no C3)
-
26/00720/FUL Granted
Devonport Dockyard Saltash Road Keyham Plymouth PL1 4SG
Roof and wall replacement to Building S154 (part retrospective)
-
26/00865/FUL Granted
1 Siding Road Plymouth PL4 6AF
Removal and replacement of timber cladding with cement render across front elevation and gable ends of building
-
26/01167/FUL Granted
81 St Pancras Avenue Plymouth PL2 3SF
Hardstanding and dropped kerb with associated works