Skip to content
PlanIndex Get alerts
Menu

Planning application

45 Bonville Road Plymouth PL6 6TE

Granted Plymouth 19/00857/FUL Full Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single and two-storey rear extension

As published by the council, reference 19/00857/FUL

Application record

Reference
19/00857/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
29 May 2019
Validated
10 Jul 2019
Decided
2 Sep 2019
Ward
SOUTHWAY
Decision by
Delegated Decision
Postcode
PL6 6TE

Timeline

Dates from the published record

  1. 29 May 2019

    Received by Plymouth

  2. 10 Jul 2019

    Validated

    Checked as complete and ready for consideration.

  3. 2 Sep 2019

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 103 Bampfylde Way Plymouth PL6 6SS

    25/01641/FUL Submitted 15 Dec 2025 79m away

    EV charging point

    Granted Full applications 8 docs
  • 87 Bampfylde Way Plymouth PL6 6SS

    19/00058/FUL Submitted 16 Jan 2019 80m away

    Installation of domestic vehicle crossing and hardstanding

    Granted Full applications 12 docs
  • 36 Bonville Road Plymouth PL6 6TE

    20/00045/PIP Submitted 14 Jan 2020 84m away

    New dwelling

    Granted Outline New dwelling 12 docs
    Domestic
  • 21 Law Walk Plymouth PL6 6LY

    26/01075/PRDE Submitted 30 Jul 2026 186m away

    93% historically approved · decision due ~24 Sep

    Loft conversion

    Awaiting decision Loft or dormer 6 docs
  • 21 Law Walk Plymouth PL6 6LY

    26/00322/FUL Submitted 4 Mar 2026 200m away

    Domestic loft conversion with dormers

    Refused Full applications Loft or dormer 17 docs
  • Former Southway Primary School Bampfylde Way Plymouth PL6 6SR

    18/02074/AMD Submitted 11 Dec 2018 224m away

    Non-material Amendment: Revision of bin storage strategy for plots 58 - 64 including the addition of a communal bin store for plots 60 - 64. Revision of landscaping scheme to reflect previous NMA application for application 16/01128/FUL

    Decided Amendments 6 docs

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01214/FUL Awaiting decision

    10 Clifton Place Plymouth PL4 8HX

    Change of use from a dwellinghouse (Class C3) to a residential Institution (Class C2)

    31 Aug 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications