Planning application
87 Bampfylde Way Plymouth PL6 6SS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of domestic vehicle crossing and hardstanding
As published by the council, reference 19/00058/FUL
Application record
- Reference
- 19/00058/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 16 Jan 2019
- Validated
- 23 Jan 2019
- Decided
- 13 Mar 2019
- Ward
- SOUTHWAY
- Decision by
- Delegated Decision
- Postcode
- PL6 6SS
Timeline
Dates from the published record
-
16 Jan 2019
Received by Plymouth
-
23 Jan 2019
Validated
Checked as complete and ready for consideration.
-
13 Mar 2019
Decision issued: Grant Conditionally
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
17 applications on PlanIndex · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Domestic
-
-
45 Bonville Road Plymouth PL6 6TE
Single and two-storey rear extension
Granted Full applications Extension 8 docs -
Former Southway Primary School Bampfylde Way Plymouth PL6 6SR
Non-material Amendment: Revision of bin storage strategy for plots 58 - 64 including the addition of a communal bin store for plots 60 - 64. Revision of landscaping scheme to reflect previous NMA application for application 16/01128/FUL
Decided Amendments 6 docs -
Former Southway Primary School Bampfylde Way Plymouth PL6 6SR
Non-material Amendment: Revisions to rear gardens and canopy widths for application 17/01277/S73M
Decided Amendments 14 docs -
Land At Bond Street/Bampfylde Way Plymouth
Non-material Amendment: Changes to fininshed levels of Pitch 2 for application 17/01915/FUL
Decided Amendments 4 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01214/FUL Awaiting decision
10 Clifton Place Plymouth PL4 8HX
Change of use from a dwellinghouse (Class C3) to a residential Institution (Class C2)
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works