Planning application
2 Barrie Gardens Plymouth PL5 3DW
Works: Extension
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Two-storey side and rear extensions
As published by the council, reference 19/00466/FUL
Application record
- Reference
- 19/00466/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Refuse
- Received
- 22 Mar 2019
- Validated
- 30 Apr 2019
- Decided
- 17 Jun 2019
- Ward
- EGGBUCKLAND
- Decision by
- Delegated Decision
- Postcode
- PL5 3DW
Timeline
Dates from the published record
-
22 Mar 2019
Received by Plymouth
-
30 Apr 2019
Validated
Checked as complete and ready for consideration.
-
17 Jun 2019
Decision issued: Refuse
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Guildford
70 applications on PlanIndex · across 9 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2 Barrie Gardens Plymouth PL5 3DW
Front porch extension.
Granted Full applications Extension 15 docsSmall domestic -
2 Barrie Gardens Plymouth PL5 3DW
Two-storey rear extension (re-submission of application 19/00466/FUL)
Granted Full applications Extension 8 docs -
Manadon Vale Primary School St Peters Road Plymouth PL5 3DL
Variation of Condition 1 of application 18/00500/FUL
Granted Amendments 14 docs -
352 St Peters Road Plymouth PL5 3DR
Hardstanding inc. boundary wall and access gate
Refused Full applications 15 docsSmall domestic -
45 Hardy Crescent Plymouth PL5 3DP
93% historically approved · decision due ~21 Jan
Single storey side garage and driveway
Awaiting decision Full applications 15 docsSmall domestic -
336 St Peters Road Plymouth PL5 3DR
Construction of 2 off-street parking spaces with turning head
Withdrawn Full applications 12 docs
Other full applications applications
In Plymouth
-
26/01232/FUL Awaiting decision
10 Burrow Hill Plymouth PL9 9LE
First floor rear extension
-
26/01210/FUL Awaiting decision
10 Ferrers Road Plymouth PL5 1TX
EV charging point
-
26/01204/FUL Awaiting decision
59 Tapson Drive Plymouth PL9 9UA
Single storey extension to rear elevation
-
26/01200/FUL Awaiting decision
201 Tavistock Road Plymouth PL6 5DA
Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works
-
26/01197/FUL Awaiting decision
51 Emma Place Plymouth PL1 3QU
Installation of EV charger to facilitate pavement channel charging