Skip to content
PlanIndex Get alerts
Menu

Planning application

40 Corporation Road Plymouth PL2 3NT

Awaiting decision Plymouth 26/01163/FUL Full applications

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

First floor extension above existing rear extension

As published by the council, reference 26/01163/FUL

Application record

Reference
26/01163/FUL
Category
Full applications
Status
Awaiting decision
Received
17 Aug 2026
Validated
28 Aug 2026
Ward
PEVERELL
Postcode
PL2 3NT

Timeline

Dates from the published record

  1. 17 Aug 2026

    Received by Plymouth

  2. 28 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Plymouth took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Plymouth

81 applications on PlanIndex · across 3 councils · 93% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Plymouth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 207 Outland Road Plymouth PL2 3PF

    18/02036/FUL Submitted 3 Dec 2018 102m away

    Erection of external cafe and WC and new pedestrian access to Outland Road

    Granted Full applications 21 docs
  • 26 Chestnut Road Plymouth PL3 5UE

    21/01120/FUL Submitted 16 Jun 2021 128m away

    Single storey rear extension

    Granted Full applications Extension 11 docs
    Small domestic
  • 291 Ham Drive Plymouth PL2 3NH

    24/01500/FUL Submitted 13 Nov 2024 137m away

    Proposed installation of timber shelter, fixed seating, lighting and televisions within pub garden area

    Granted Full applications 17 docs
  • 45 Langstone Road Plymouth PL2 3LZ

    25/01370/FUL Submitted 16 Oct 2025 143m away

    93% historically approved · decision due ~24 Dec

    Loft conversion with hip to gable end and rear dormer

    Awaiting decision Full applications Loft or dormer 13 docs
  • 21 Pridham Lane Plymouth PL2 3PH

    23/00017/FUL Submitted 6 Jan 2023 168m away

    Proposed single storey rear extension

    Granted Full applications Extension 12 docs
    Small domestic
  • 216 Outland Road Plymouth PL2 3PE

    21/00973/HHR Submitted 24 May 2021 182m away

    Pre-application to utilise garage roof as a seating area

    Decided Householder 1 doc
    Domestic

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications