Skip to content
PlanIndex Get alerts
Menu

Planning application

Plymouth Pavilions Millbay Road Plymouth PL1 3LF

Granted Plymouth 18/02059/FUL Full Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The removal of the existing storage containers and new 2-storey Storage extension to the rear of the Plymouth Pavilions building and the relocation of the existing chiller units The proposal is a result of the proposed Millbay boulevard proposal which proposes to remove the existing ramp and part of the service yard land to the rear of the site to make way for the new boulevard.

As published by the council, reference 18/02059/FUL

Application record

Reference
18/02059/FUL
Type
Full Application
Status
Decided
Decision
Grant Conditionally
Received
7 Dec 2018
Validated
19 Dec 2018
Decided
6 Mar 2019
Ward
ST PETER AND THE WATERFRONT
Decision by
Delegated Decision
Postcode
PL1 3LF

Timeline

Dates from the published record

  1. 7 Dec 2018

    Received by Plymouth

  2. 19 Dec 2018

    Validated

    Checked as complete and ready for consideration.

  3. 6 Mar 2019

    Decision issued: Grant Conditionally

  4. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

3 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

34 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Plymouth Pavilions Millbay Road Plymouth PL1 3LF

    18/02123/11 Submitted 20 Dec 2018 54m away

    Demolition of service ramp and the adjacent chiller compound

    Granted Outline Demolition 10 docs
  • Former Mount Pleasant Inn 12 Millbay Road Plymouth PL1 3LF

    21/01371/FUL Submitted 20 Jul 2021 72m away

    Change of use to car park for a temporary period of 5 years

    Withdrawn Full applications 14 docs
  • 14 Millbay Road Plymouth PL1 3LH

    24/01110/MOR Submitted 28 Aug 2024 74m away

    Pre-application for alterations to car park access, plus installation of barrier and EV charging points

    Decided Outline 5 docs
  • 27 Bath Street Plymouth PL1 3FQ

    21/00630/MJR Submitted 1 Apr 2021 74m away

    Pre-application for changes to existing planning approval (19/01859/S73)

    Decided Outline 10 docs
    Major scheme
  • Bath Street Plymouth PL1 3LT

    21/00808/CDM Submitted 30 Apr 2021 79m away

    Condition Discharge: Conditions 7 (CEMP) & 14 (Contractor access) of application 19/01859/S73

    Decided Conditions 12 docs
  • 9 Bath Street Plymouth PL1 3LT

    21/00806/MJR Submitted 29 Apr 2021 81m away

    Pre-application to review cladding changes of application 19/01859/S73

    Decided Outline 4 docs
    Major scheme

In Plymouth

  • 26/01232/FUL Awaiting decision

    10 Burrow Hill Plymouth PL9 9LE

    First floor rear extension

    4 Sep 2026 Full applications
  • 26/01210/FUL Awaiting decision

    10 Ferrers Road Plymouth PL5 1TX

    EV charging point

    1 Sep 2026 Full applications
  • 26/01204/FUL Awaiting decision

    59 Tapson Drive Plymouth PL9 9UA

    Single storey extension to rear elevation

    28 Aug 2026 Full applications
  • 26/01200/FUL Awaiting decision

    201 Tavistock Road Plymouth PL6 5DA

    Demolition of existing petrol filling station structures and re-development to rental vehicle premises including vehicle hire office and vehicle preparation workshop, car parking (including rental vehicle storage), hard and soft landscaping and associated works

    27 Aug 2026 Full applications
  • 26/01197/FUL Awaiting decision

    51 Emma Place Plymouth PL1 3QU

    Installation of EV charger to facilitate pavement channel charging

    26 Aug 2026 Full applications