Archive · Peterborough · 2011
Planning applications in Peterborough, August 2011
Page 4 of 4, newest first. Back to the first page for August 2011.
Applications, August 2011
Newest first ยท page 4 of 4
-
11/01208/FUL Withdrawn
McDonalds Padholme Road East Fengate Peterborough PE1 5XL
Construction of new side-by-side drive thru lane, reconfiguration of car park allowing 8no. additional parking spaces, 2no. Customer Order Display Units and Canopies and 1no. Height Restrictor Monolith / Gateway Sign
-
11/01209/ADV Withdrawn
McDonalds Padholme Road East Fengate Peterborough PE1 5XL
Installation of 2 x internally illuminated Totem 4-2 Bay Triple, 3 x internally illuminated Totem 3- Pre Sell boards, 1 x internally illuminated Hero Poster board; 1 x internally illuminated height restrictor Monolith/Gateway sign and 1 x side by side directional sign
-
11/01218/NDEM Granted
7 - 23 London Road Peterborough PE2 8AN
Notification of demolition of retail units, former night club and garage undercroft
-
11/01220/NDEM Granted
Former B&Q / Matalan Stores East Station Road Peterborough PE2 8AQ
Notification of demolition of former retail units
-
11/01243/FUL Granted
46 Elm Crescent Glinton Peterborough PE6 7LE
Construction of pitched roof and bay window
-
11/01229/FUL Refused
97 Garton End Road Peterborough PE1 4EZ
Granny annex and conservatory to rear
-
11/01204/DISCHG Decided
Land To The East Of Alwalton Hill Fletton Parkway Peterborough
Discharge of conditions C11 (Great Crested Newt Stategy) and C12 (Biodiversity Strategy) of planning permission 09/01369/OUT - Development of up to 65 hectares of employment land (B1, B2 and B8 including safeguarding of a site for a household recycling centre/park and ride). Associated highway infrastructure (including pedestrian, bridleway and cycle routes), and car parking for all uses. Foul and surface water drainage networks (including SuDS and lakes)
-
11/01169/FUL Granted
173 Fletton Avenue Peterborough PE2 8DB
Replacement of timber sliding sash windows with UPVC sliding sash to front elevation, re-establishment of original front door and frame
Other months in 2011
- January 2011 123
- February 2011 133
- March 2011 172
- April 2011 132
- May 2011 207
- June 2011 167
- July 2011 154
- August 2011 158
- September 2011 163
- October 2011 143
- November 2011 149
- December 2011 115