Planning application
Hampton Beach Peterborough
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
21/00960/REM - Part Discharge of condition C21 (Fire Hydrants)
As published by the council, reference 26/003170/DISCHG
Application record
- Reference
- 26/003170/DISCHG
- Type
- Compliance with Planning Condition(s)
- Status
- Awaiting Allocation
- Received
- 10 Nov 2026
- Validated
- 12 Nov 2026
- Ward
- Hargate & Hempsted
Site history
Applications at this address on the Peterborough register
This site has had 6 applications since 2023: 1 approved, 0 refused.
-
24/01238/DISCHG Decided
Hampton Beach Peterborough
Discharge of condition C28 (solar panels) of reserved matters consent 21/00960/REM
-
23/00722/NONMAT Decided
Hampton Beach Peterborough
Non-material amendment (removal of bollards to the end of private drives and replacement with raised kerbs and low level planting) to planning permission reference 21/00960/REM
-
23/00352/DISCHG Decided
Hampton Beach Peterborough
Discharge of condition C14 (Surface Materials) and C17 (Highway feature) of reserved matters consent reference 21/00960/REM
-
23/00114/ADV Granted
Hampton Beach Peterborough
34 x non illuminated Hoarding signs, along western boundary of development- retrospective
-
23/00042/NONMAT Decided
Hampton Beach Peterborough
Non-material amendment (amendments with primary objective of accommodating NHBC requirements with regards to unprotected areas, removing optional side windows to some plots. Amendments also include one housetype substitution, alteration of one section of adoptable road to private drive, and additional bin storage point) pursuant to planning permission 21/00960/REM
Timeline
Dates from the published record
-
10 Nov 2026
Received by Peterborough
-
12 Nov 2026
Validated
Checked as complete and ready for consideration.
-
15 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Peterborough took a median of 54 days over the applications it decided in the last year.
Documents
4 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with Peterborough for determination, against a statutory target of eight weeks. Over the last year Peterborough decided condition discharge and variation applications in a median of 58 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To The West Of London Road Peterborough
Discharge of condition C15 (bollard installation details) of reserved matters consent reference 21/00960/REM
Withdrawn Conditions 10 docs -
Hampton Beach Peterborough
Non-material amendment (removal of bollards to the end of private drives and replacement with raised kerbs and low level planting) to planning permission reference 21/00960/REM
Decided Amendments 13 docs -
Hampton Woods Parcel R09 Hampton Peterborough
Discharge of condition C8b (fire hydrants) of reserved matters consent reference 22/00072/REM
Decided Conditions 6 docs -
Hampton Woods Parcel R09 Hampton Peterborough
Part discharge of condition C8(B) (fire hydrants) of reserved matters consent reference 22/00072/REM
Decided Conditions 6 docs -
Hampton Beach The Hamptons East Development Area Peterborough
Discharge of condition C12 (visibility splays) of reserved matters permission reference 21/00960/REM
Decided Conditions 8 docs -
Hampton Beach Peterborough
Discharge of condition C28 (solar panels) of reserved matters consent 21/00960/REM
Decided Conditions 13 docs
Other condition discharge and variation applications
In Peterborough
-
26/002949/DISCHG Decided
Land O, Land To The North Of Norman Cross London Road Peterborough
09/01368/OUT - Part discharge of condition C.59a (archaeological mitigation strategy WSI) ownership area O
-
26/002947/DISCHG Decided
Land O, Phase 4a, Land To The North Of Norman Cross London Road Peterborough
09/01368/OUT - Discharge of condition c59a (archaeological mitigation strategy) of outline planning permission 09/01368/OUT
-
26/002808/DISCHG Withdrawn
Land O, Land To The North Of Norman Cross, Great Haddon, London Road, Peterborough
09/01368/OUT - Part-discharge of condition C23 (Site Specific Construction Management Plan)
-
26/002950/DISCHG Decided
The Old Chapel The Causeway Thorney Peterborough
26/002583/FUL - Discharge of conditions C3 (external materials) and C4 (soft landscaping)
-
26/002927/DISCHG Decided
Parcel R09, Phase 4 Hampton Woods, Peterborough
22/00072/REM - Part discharge of condition C9 (Remediation)