Planning application
River Nene between Fletton Quays and the Embankment, Peterborough
Relates to 24/00644/R3FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
24/00644/R3FUL - Discharge of condition C3 (materials) of planning permission 24/00644/R3FUL
As published by the council, reference 26/002764/DISCHG
Application record
- Reference
- 26/002764/DISCHG
- Type
- Compliance with Planning Condition(s)
- Status
- Pending Decision
- Received
- 11 Aug 2026
- Validated
- 11 Aug 2026
- Decision by
- Delegated Decision (Officer)
Site history
Applications at this address on the Peterborough register
This site has had 4 applications since 2024: 1 approved, 0 refused.
-
26/00175/DISCHG Decided
River Nene Between Fletton Quays And The Embankment Peterborough
Discharge of condition C3 (external materials), C8 (lighting design strategy for
-
25/01094/DISCHG Decided
River Nene Between Fletton Quays And The Embankment Peterborough
Discharge of conditions C6 (CEMP), Condition C7 (BNG), C10 (construction phase &
-
24/00644/R3FUL Granted
River Nene Between Fletton Quays And The Embankment Peterborough
Erection of a pedestrian footbridge across the River Nene
Timeline
Dates from the published record
-
11 Aug 2026
Received by Peterborough
-
26 Aug 2026
Added to PlanIndex
-
2 Oct 2026
Status changed to Pending Decision
Previously Allocated.
-
Decision
Awaiting decision
Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Peterborough took a median of 54 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
24/00644/R3FUL Granted
River Nene Between Fletton Quays And The Embankment Peterborough
Erection of a pedestrian footbridge across the River Nene
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Peterborough for determination, against a statutory target of eight weeks. Over the last year Peterborough decided condition discharge and variation applications in a median of 59 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
River Nene Between Fletton Quays And The Embankment Peterborough
Erection of a pedestrian footbridge across the River Nene
Granted Full applications 62 docs -
Former B And Q/Matalan Stores East Station Road Peterborough PE2 8AQ
Change of use from A1 (retail) to either B8 (storage and distribution) or D2 (assembly and leisure)
Granted Full applications 2 docs -
Former B&Q / Matalan Stores East Station Road Peterborough PE2 8AQ
Notification of demolition of former retail units
Granted Other Demolition 12 docs -
Former B&Q / Matalan Stores East Station Road Peterborough PE2 8AQ
Screening opinion for the need of an Environmental Impact Assessment Notification for the demolition of former retail units
Decided Outline Demolition 7 docs -
Site Known As Plot 1A Fletton Quays East Station Road Peterborough
Discharge of conditions C2 (external building materials) and C21 (treatment of riverbank) of planning permission 17/01766/FUL
Decided Conditions 9 docs -
Fletton Quays Land At East Station Road Peterborough
Non-material amendment to change the wording of Condition 6 of 16/02349/REM relating to the date when details, including timetable of works, for the dismantling of the staircase needs to be submitted
Decided Amendments 5 docs
Other condition discharge and variation applications
In Peterborough
-
26/002981/DISCHG Status unknown
Land Adjacent to Unit B1, Club Way, Cygnet Park, Hampton, Peterborough, PE7 8JA
Discharge of Statutory BNG condition and part discharge of condition C4 (validat
-
26/002978/DISCHG Awaiting decision
Land West of Newborough Road, Paston Reserve, Newborough Road
23/01102/REM - Part discharge of condition C17 (validation report)
-
26/002729/DISCHG Decided
17A, Old Leicester Road, Wansford, Peterborough, PE8 6JR
25/01335/HHFUL - Discharge of condition C3 (materials) of planning permission 25
-
26/002969/DISCHG Awaiting decision
Aqua Drive Hampton Leys, Phorpres Way, Cygnet Park, Hampton Peterborough PE7 8TR
25/00529/REM - Discharge of condition C10 (EV charging points details) of reserv
-
26/002967/DISCHG Awaiting decision
Unit A Brotherhood Shopping Park Brotherhood Close Walton Peterborough PE4 6ZR
25/00827/FUL- Discharge of conditions C4 (Construction Traffic Management Plan),