Planning application
26/00578/SCRN
Shindour Feddal Hill Wood Braco
Proposal
Formation of 400kV substation comprising erection of control building, engineering operations, formation of hardstanding, access track, temporary laydown/work compound areas and drainage, installation of plant and machinery, alterations to existing track and associated works and formation of a track comprising a running surface of approximately 1.2 kilometres in length, bridge, access, laydown/work compound area(s), drainage, landscaping and other ancillary works
As published by the council, reference 26/00578/SCRN
Timeline
Dates from the published record
-
29 Apr 2026
Received by Perth and Kinross
-
25 May 2026
Validated
Checked as complete and ready for consideration.
-
25 May 2026
Decision issued: closed
-
28 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Other outline applications
In Perth and Kinross
-
26/00832/IPL Awaiting decision
Land 50 Metres North Of Rowanbank Newfargie Glenfarg Perth PH2 9QT
Erection of dwellinghouse (in principle)
-
26/00464/IPL Refused
Land 50 Metres North East Of Flawcraig Rait
Residential development (in principle)
-
26/00527/SCRN Decided
Land 1400 Metres North West Of Beannie Farm Braco Dunblane FK15 9LL
Screening Request - Hydrogen Facility
-
26/00340/IPL Granted
Land 40 Metres East Of Dunollie Fossoway Kinross KY13 0UP
Erection of a dwellinghouse (in principle)
-
26/00553/SCOP Decided
Land 880 Metres North Of Bertha Park Farm Perth PH1 3EQ
Erection of an office building, formation of vehicular parking, installation of EV charging units, sustainable drainage systems, erection of security fencing, landscaping and associated works