Planning application
Shindour Feddal Hill Wood Braco
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Formation of 400kV substation comprising erection of control building, engineering operations, formation of hardstanding, access track, temporary laydown/work compound areas and drainage, installation of plant and machinery, alterations to existing track and associated works and formation of a track comprising a running surface of approximately 1.2 kilometres in length, bridge, access, laydown/work compound area(s), drainage, landscaping and other ancillary works
As published by the council, reference 26/00578/SCRN
Application record
- Reference
- 26/00578/SCRN
- Type
- Screening Opinion
- Status
- Decided
- Decision
- closed
- Received
- 29 Apr 2026
- Validated
- 25 May 2026
- Decided
- 25 May 2026
- Ward
- Strathallan
- Parish
- Braco And Greenloaning
Timeline
Dates from the published record
-
29 Apr 2026
Received by Perth and Kinross
-
25 May 2026
Validated
Checked as complete and ready for consideration.
-
25 May 2026
Decision issued: closed
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Perth and Kinross has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Perth and Kinross
-
26/00684/IPL Granted
Land 25 Metres South Of Davaar Main Street Glenfarg Perth PH2 9NY
Erection of dwellinghouse (in principle)
-
26/00053/IPL Refused
Land 40 Metres West Of Levenmouth Farmhouse Scotlandwell
Residential development (in principle)
-
26/01269/IPL Awaiting decision
Monzievaird And Strowan Hall Monzievaird Crieff
Erection of a dwellinghouse (in principle)
-
26/01230/SCOP Decided
Land 120 Metres South East Of Wardheads Farm Errol Perth PH2 7SW
The construction and operation of up to 500MW ground-mounted solar PV farm together with up to 100MW co-located BESS and associated infrastructure including inverter/transformer stations, substations (including Site substation and Transmission Operator Grid substation), underground cabling, access tracks, temporary construction compounds, security fencing, CCTV, landscaping, and biodiversity enhancements
-
26/00755/IPL Granted
Hamilton Bank Craigie Road Perth PH2 0BQ
Erection of a dwellinghouse (in principle)